FHWA NBI 2024 Inspection record Public-domain dataset

SR 25

Carrying SR 25 over LOST CREEK

03.94 S US 231, Tippecanoe, Indiana

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
97 t Inventory load rating Higher than 99% of rated Indiana bridges

SR 25 in Tippecanoe, Indiana sits above 99% of rated Indiana bridges on inventory load rating (97 t), while its 1987 build year is earlier than 41% of Tippecanoe's recorded-year cohort (330 bridges).

SR 25 in Tippecanoe, Indiana is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1987, it carries 1 rated component on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure IN:006340

LATE-CENTURY · STEEL · MULTI-SPAN · CULVERT-LED · HEAVY-ADT · HEAVY-LOAD · CAT-FAIR

  • LATE-CENTURY 1980–1999
  • STEEL Steel
  • MULTI-SPAN 2 spans
  • CULVERT-LED Culvert-led
  • HEAVY-ADT Heavy ADT
  • HEAVY-LOAD Heavy load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: SR 25

The SR 25 bridge in Tippecanoe, Indiana carries SR 25 over LOST CREEK. It was built in 1987, making it 39 years old today. The structure is built primarily of steel and spans 2 sections, stretching 7.9 meters (26 feet) end to end. Daily traffic averages 11,187 vehicles, placing it in the heavily-trafficked tier of Indiana bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show culvert at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How SR 25 compares

▲ 61.7
Load rating vs Indiana average (35.5 t; 19,495 rated)
330
Bridges in Tippecanoe · 17 in Poor condition

Age against the county: built in 1987, earlier than 134 of Tippecanoe's 330 bridges with a recorded construction year (41%), against a county median build year of 1980. This is one of the newer structures in its county.

SR 25 97.2 t
Indiana average (19,495 rated) 35.5 t

Live comparison across Indiana bridges with a recorded inventory load rating (19,495 rated).

SR 25 vs every rated Indiana bridge

Inventory load rating (metric tons), FHWA NBI, this state

97 Top 1% higher than 99% of 19,495 bridges

rated Indiana bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Culvert
6/9
Fair (5–6)
Inventory Load Rating
97.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Tippecanoe inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 330 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1987
Material
Steel
Number of Spans
2
Structure Length
7.9 m (26 ft)
0
Owner
State Highway Agency
Avg Daily Traffic
11,187 vehicles/day
Structure Number
006340

How to read this record

This page shows what the last federal inspection recorded, not whether SR 25 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR 25 against other structures in Tippecanoe and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 25?

SR 25 in Tippecanoe, Indiana on the FHWA's 0–9 scale.

How often is SR 25 inspected?

SR 25's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 11,187 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 25 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 25?

SR 25 has an NBI inventory load rating of 97.2 metric tons.

Who is responsible for maintaining SR 25?

SR 25 is owned and maintained by State Highway Agency.

How old is SR 25 and does age affect safety?

SR 25 was built in 1987, making it 39 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.