FHWA NBI 2024 Inspection record Public-domain dataset

225TH ST EAST

Carrying 225TH ST EAST over HINKLE CREEK

00.15 E OF HINKLE RD, Hamilton, Indiana

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
26 t Inventory load rating Lower than 86% of rated Indiana bridges

225TH ST EAST in Hamilton, Indiana sits above 14% of rated Indiana bridges on inventory load rating (26 t), while its 1992 build year is earlier than 65% of Hamilton's recorded-year cohort (454 bridges).

225TH ST EAST in Hamilton, Indiana is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1992, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure IN:2900088

LATE-CENTURY · CONCRETE · MULTI-SPAN · TIED-CTRL · LOCAL-ADT · STANDARD-LOAD · CAT-FAIR

  • LATE-CENTURY 1980–1999
  • CONCRETE Concrete
  • MULTI-SPAN 3 spans
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: 225TH ST EAST

The 225TH ST EAST bridge in Hamilton, Indiana carries 225TH ST EAST over HINKLE CREEK. It was built in 1992, making it 34 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 29.9 meters (98 feet) end to end. Daily traffic averages 210 vehicles, placing it in the lower-traffic tier of Indiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How 225TH ST EAST compares

▼ 9.9
Load rating vs Indiana average (35.5 t; 19,495 rated)
454
Bridges in Hamilton · 12 in Poor condition

Age against the county: built in 1992, earlier than 295 of Hamilton's 454 bridges with a recorded construction year (65%), against a county median build year of 2002. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

225TH ST EAST 25.6 t
Indiana average (19,495 rated) 35.5 t

Live comparison across Indiana bridges with a recorded inventory load rating (19,495 rated).

225TH ST EAST vs every rated Indiana bridge

Inventory load rating (metric tons), FHWA NBI, this state

26 Top 86% higher than 14% of 19,495 bridges

rated Indiana bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
25.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Hamilton inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 454 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1992
Material
Concrete Continuous
Number of Spans
3
Structure Length
29.9 m (98 ft)
Deck Width
9.1 m (30 ft)
Owner
County Highway Agency
Avg Daily Traffic
210 vehicles/day
Structure Number
2900088

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether 225TH ST EAST is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare 225TH ST EAST against other structures in Hamilton and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 225TH ST EAST?

225TH ST EAST in Hamilton, Indiana has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is 225TH ST EAST inspected?

225TH ST EAST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 210 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 225TH ST EAST is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 225TH ST EAST?

225TH ST EAST has an NBI inventory load rating of 25.6 metric tons.

Who is responsible for maintaining 225TH ST EAST?

225TH ST EAST is owned and maintained by County Highway Agency.

How old is 225TH ST EAST and does age affect safety?

225TH ST EAST was built in 1992, making it 34 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.