FHWA NBI 2024 Inspection record Public-domain dataset

WONJU ROAD

Carrying WONJU ROAD over TRIBUTARY OF BIG CREEK

0.3 MILE NORTH OF G ROAD, Ripley, Indiana

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
3 t Inventory load rating Lower than 99% of rated Indiana bridges

WONJU ROAD in Ripley, Indiana sits above 1% of rated Indiana bridges on inventory load rating (3 t), while its 1990 build year is earlier than 29% of Ripley's recorded-year cohort (191 bridges).

WONJU ROAD in Ripley, Indiana is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1990, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure IN:AFINLTWL00609

LATE-CENTURY · STEEL · SINGLE-SPAN · SUPER-LED · TRACE-ADT · LIGHT-LOAD · CAT-POOR

  • LATE-CENTURY 1980–1999
  • STEEL Steel
  • SINGLE-SPAN Single span
  • SUPER-LED Superstructure-led
  • TRACE-ADT Trace ADT
  • LIGHT-LOAD Light load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: WONJU ROAD

The WONJU ROAD bridge in Ripley, Indiana carries WONJU ROAD over TRIBUTARY OF BIG CREEK. It was built in 1990, making it 36 years old today. The structure is built primarily of steel and spans 1 section, stretching 8.9 meters (29 feet) end to end. Daily traffic averages 10 vehicles, placing it in the lower-traffic tier of Indiana bridges. It is owned and maintained by Navy/Marine.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed.

How WONJU ROAD compares

▼ 32.8
Load rating vs Indiana average (35.5 t; 19,495 rated)
191
Bridges in Ripley · 6 in Poor condition

Age against the county: built in 1990, earlier than 55 of Ripley's 191 bridges with a recorded construction year (29%), against a county median build year of 1978. This is one of the newer structures in its county.

WONJU ROAD 2.7 t
Indiana average (19,495 rated) 35.5 t

Live comparison across Indiana bridges with a recorded inventory load rating (19,495 rated).

WONJU ROAD vs every rated Indiana bridge

Inventory load rating (metric tons), FHWA NBI, this state

3 Top 99% higher than 1% of 19,495 bridges

rated Indiana bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
2.7 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Ripley inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 191 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1990
Material
Steel
Number of Spans
1
Structure Length
8.9 m (29 ft)
Deck Width
5.1 m (17 ft)
Owner
Navy/Marine
Avg Daily Traffic
10 vehicles/day
Structure Number
AFINLTWL00609

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear on file for this vintage.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

WONJU ROAD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare WONJU ROAD against other structures in Ripley and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for WONJU ROAD?

WONJU ROAD in Ripley, Indiana has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is WONJU ROAD inspected?

WONJU ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. WONJU ROAD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for WONJU ROAD?

WONJU ROAD has an NBI inventory load rating of 2.7 metric tons.

Who is responsible for maintaining WONJU ROAD?

WONJU ROAD is owned and maintained by Navy/Marine.

How old is WONJU ROAD and does age affect safety?

WONJU ROAD was built in 1990, making it 36 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.