FHWA NBI 2024 Inspection record Public-domain dataset

SH 231 ML

Carrying SH 231 ML over ARKANSAS RIVER

1.5 MI N OF US 50 BUS.VIN, Pueblo, Colorado

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
16 t Inventory load rating

Bridge Snapshot: SH 231 ML

The SH 231 ML bridge in Pueblo, Colorado carries SH 231 ML over ARKANSAS RIVER. It was built in 1965, making it 61 years old today. It was last reconstructed in 2017, extending its service life. The structure is built primarily of steel continuous and spans 8 sections, stretching 184.1 meters (604 feet) end to end. Daily traffic averages 1,700 vehicles, placing it in the moderately-trafficked tier of Colorado bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 15.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SH 231 ML compares

▼ 21.2
Load rating vs Colorado average (37.1 t)
Bottom 4%
Lower load rating than 96% of Colorado bridges
264
Bridges in Pueblo · 11 in Poor condition
SH 231 ML 15.9 t
Colorado average 37.1 t

Live comparison across Colorado.

Historical Sufficiency Rating

PlainBridge-computed
59.3 / 100 - historical 50–79.9 band
Structural adequacy /55
23.2
Serviceability /30
22.0
Essentiality /15
14.1
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
15.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1965
Last Reconstructed
2017
Material
Steel Continuous
Number of Spans
8
Structure Length
184.1 m (604 ft)
Deck Width
10.7 m (35 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,700 vehicles/day
Structure Number
K-19-A

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether SH 231 ML is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SH 231 ML against other structures in Pueblo and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SH 231 ML?

SH 231 ML in Pueblo, Colorado has a deck rating of 7/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is SH 231 ML inspected?

SH 231 ML's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,700 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SH 231 ML is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SH 231 ML?

SH 231 ML has an NBI inventory load rating of 15.9 metric tons.

Who is responsible for maintaining SH 231 ML?

SH 231 ML is owned and maintained by State Highway Agency.

How old is SH 231 ML and does age affect safety?

SH 231 ML was built in 1965, making it 61 years old and last reconstructed in 2017.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.