FHWA NBI 2024 Inspection record Public-domain dataset

GREENWOOD PORTLAND

Carrying GREENWOOD PORTLAND over TRIB-S.FK GRASSY CK

1.3 MI W - KY 17, Pendleton, Kentucky

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
42 t Inventory load rating Higher than 63% of rated Kentucky bridges

GREENWOOD PORTLAND in Pendleton, Kentucky sits above 63% of rated Kentucky bridges on inventory load rating (42 t), while its 1992 build year is earlier than 39% of Pendleton's recorded-year cohort (94 bridges).

GREENWOOD PORTLAND in Pendleton, Kentucky is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1992, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure KY:096C00075N

LATE-CENTURY · PRESTRESS · SINGLE-SPAN · SUB-LED · TRACE-ADT · HEAVY-LOAD · CAT-FAIR

  • LATE-CENTURY 1980–1999
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • SUB-LED Substructure-led
  • TRACE-ADT Trace ADT
  • HEAVY-LOAD Heavy load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: GREENWOOD PORTLAND

The GREENWOOD PORTLAND bridge in Pendleton, Kentucky carries GREENWOOD PORTLAND over TRIB-S.FK GRASSY CK. It was built in 1992, making it 34 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 7.9 meters (26 feet) end to end. Daily traffic averages 48 vehicles, placing it in the lower-traffic tier of Kentucky bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How GREENWOOD PORTLAND compares

▲ 2.3
Load rating vs Kentucky average (39.5 t; 14,532 of 14,548 rated)
94
Bridges in Pendleton · 4 in Poor condition

Age against the county: built in 1992, earlier than 37 of Pendleton's 94 bridges with a recorded construction year (39%), against a county median build year of 1982. This is one of the newer structures in its county.

GREENWOOD PORTLAND 41.8 t
Kentucky average (14,532 of 14,548 rated) 39.5 t

Live comparison across Kentucky bridges with a recorded inventory load rating (14,532 of 14,548 rated).

GREENWOOD PORTLAND vs every rated Kentucky bridge

Inventory load rating (metric tons), FHWA NBI, this state

42 Top 37% higher than 63% of 14,532 bridges

rated Kentucky bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
41.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Pendleton inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 94 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1992
Material
Prestressed Concrete
Number of Spans
1
Structure Length
7.9 m (26 ft)
Deck Width
5.0 m (16 ft)
Owner
County Highway Agency
Avg Daily Traffic
48 vehicles/day
Structure Number
096C00075N

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether GREENWOOD PORTLAND is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare GREENWOOD PORTLAND against other structures in Pendleton and across Kentucky. Kentucky bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for GREENWOOD PORTLAND?

GREENWOOD PORTLAND in Pendleton, Kentucky has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is GREENWOOD PORTLAND inspected?

GREENWOOD PORTLAND's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 48 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. GREENWOOD PORTLAND is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for GREENWOOD PORTLAND?

GREENWOOD PORTLAND has an NBI inventory load rating of 41.8 metric tons.

Who is responsible for maintaining GREENWOOD PORTLAND?

GREENWOOD PORTLAND is owned and maintained by County Highway Agency.

How old is GREENWOOD PORTLAND and does age affect safety?

GREENWOOD PORTLAND was built in 1992, making it 34 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.