FHWA NBI 2024 Inspection record Public-domain dataset

US 385 ML

Carrying US 385 ML over ARKANSAS RIVER

2 MI NORTH OF GRANADA, Prowers, Colorado

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
19 t Inventory load rating

Bridge Snapshot: US 385 ML

The US 385 ML bridge in Prowers, Colorado carries US 385 ML over ARKANSAS RIVER. It was built in 1949, making it 77 years old today. The structure is built primarily of steel continuous and spans 5 sections, stretching 128.9 meters (423 feet) end to end. Daily traffic averages 510 vehicles, placing it in the lower-traffic tier of Colorado bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 19.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How US 385 ML compares

▼ 18.1
Load rating vs Colorado average (37.1 t)
Bottom 8%
Lower load rating than 92% of Colorado bridges
137
Bridges in Prowers · 18 in Poor condition
US 385 ML 19.0 t
Colorado average 37.1 t

Live comparison across Colorado.

Historical Sufficiency Rating

PlainBridge-computed
56.4 / 100 - historical 50–79.9 band
Structural adequacy /55
29.0
Serviceability /30
15.2
Essentiality /15
14.2
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
19.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1949
Material
Steel Continuous
Number of Spans
5
Structure Length
128.9 m (423 ft)
Deck Width
8.5 m (28 ft)
Owner
State Highway Agency
Avg Daily Traffic
510 vehicles/day
Structure Number
L-27-D

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether US 385 ML is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare US 385 ML against other structures in Prowers and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for US 385 ML?

US 385 ML in Prowers, Colorado has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is US 385 ML inspected?

US 385 ML's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 510 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. US 385 ML is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for US 385 ML?

US 385 ML has an NBI inventory load rating of 19.0 metric tons.

Who is responsible for maintaining US 385 ML?

US 385 ML is owned and maintained by State Highway Agency.

How old is US 385 ML and does age affect safety?

US 385 ML was built in 1949, making it 77 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.