FHWA NBI 2024 Inspection record Public-domain dataset

S BOULDER RD

Carrying S BOULDER RD over LWR S BOULDER RIVER 066

5M S JEFFERSON ISLAND, Madison, Montana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
17 t Inventory load rating

Bridge Snapshot: S BOULDER RD

The S BOULDER RD bridge in Madison, Montana carries S BOULDER RD over LWR S BOULDER RIVER 066. It was built in 2003, making it 23 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 14.3 meters (47 feet) end to end. Daily traffic averages 100 vehicles, placing it in the lower-traffic tier of Montana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 17.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How S BOULDER RD compares

▼ 13.5
Load rating vs Montana average (30.7 t)
Bottom 10%
Lower load rating than 90% of Montana bridges
84
Bridges in Madison · 11 in Poor condition
S BOULDER RD 17.2 t
Montana average 30.7 t

Live comparison across Montana.

Historical Sufficiency Rating

PlainBridge-computed
67.4 / 100 - historical 50–79.9 band
Structural adequacy /55
35.7
Serviceability /30
18.8
Essentiality /15
14.9
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
17.2 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2003
Material
Prestressed Concrete
Number of Spans
1
Structure Length
14.3 m (47 ft)
Deck Width
7.9 m (26 ft)
Owner
County Highway Agency
Avg Daily Traffic
100 vehicles/day
Structure Number
L29062002+05001

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether S BOULDER RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare S BOULDER RD against other structures in Madison and across Montana. Montana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for S BOULDER RD?

S BOULDER RD in Madison, Montana has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is S BOULDER RD inspected?

S BOULDER RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. S BOULDER RD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for S BOULDER RD?

S BOULDER RD has an NBI inventory load rating of 17.2 metric tons.

Who is responsible for maintaining S BOULDER RD?

S BOULDER RD is owned and maintained by County Highway Agency.

How old is S BOULDER RD and does age affect safety?

S BOULDER RD was built in 2003, making it 23 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.