FHWA NBI 2024 Inspection record Public-domain dataset

LAPINE RD

Carrying LAPINE RD over CPRESS CREEK

5.3 MI. S. OF LA 34, Ouachita, Louisiana

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
25 t Inventory load rating Lower than 72% of rated Louisiana bridges

LAPINE RD in Ouachita, Louisiana sits above 28% of rated Louisiana bridges on inventory load rating (25 t), while its 2018 build year is earlier than 3% of Ouachita's recorded-year cohort (337 bridges).

LAPINE RD in Ouachita, Louisiana is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2018, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure LA:053700000050296

POST-2000 · TIMBER · MULTI-SPAN · SUPER-LED · LOCAL-ADT · STANDARD-LOAD · CAT-GOOD

  • POST-2000 2000+
  • TIMBER Wood or timber
  • MULTI-SPAN 3 spans
  • SUPER-LED Superstructure-led
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: LAPINE RD

The LAPINE RD bridge in Ouachita, Louisiana carries LAPINE RD over CPRESS CREEK. It was built in 2018, making it 8 years old today. The structure is built primarily of wood or timber and spans 3 sections, stretching 15.5 meters (51 feet) end to end. Daily traffic averages 212 vehicles, placing it in the lower-traffic tier of Louisiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 7/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range.

How LAPINE RD compares

▼ 7.7
Load rating vs Louisiana average (32.2 t; 12,682 of 12,698 rated)
337
Bridges in Ouachita · 43 in Poor condition

Age against the county: built in 2018, earlier than 11 of Ouachita's 337 bridges with a recorded construction year (3%), against a county median build year of 1978. This is one of the newer structures in its county.

LAPINE RD 24.5 t
Louisiana average (12,682 of 12,698 rated) 32.2 t

Live comparison across Louisiana bridges with a recorded inventory load rating (12,682 of 12,698 rated).

LAPINE RD vs every rated Louisiana bridge

Inventory load rating (metric tons), FHWA NBI, this state

25 Top 72% higher than 28% of 12,682 bridges

rated Louisiana bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
24.5 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Ouachita inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 337 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2018
Material
Wood or Timber
Number of Spans
3
Structure Length
15.5 m (51 ft)
Deck Width
7.4 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
212 vehicles/day
Structure Number
053700000050296

Condition Analysis

  • The deck (driving surface) is in good condition (8/9), showing no significant deterioration.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether LAPINE RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare LAPINE RD against other structures in Ouachita and across Louisiana. Louisiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for LAPINE RD?

LAPINE RD in Ouachita, Louisiana has a deck rating of 8/9, superstructure rating of 7/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is LAPINE RD inspected?

LAPINE RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 212 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. LAPINE RD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for LAPINE RD?

LAPINE RD has an NBI inventory load rating of 24.5 metric tons.

Who is responsible for maintaining LAPINE RD?

LAPINE RD is owned and maintained by County Highway Agency.

How old is LAPINE RD and does age affect safety?

LAPINE RD was built in 2018, making it 8 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.