FHWA NBI 2024 Inspection record Public-domain dataset

THIRD STREET

Carrying THIRD STREET over ANDERSON ARROYO

300 FT W OF MAPLE AVENUE, Otero, Colorado

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
23 t Inventory load rating

Bridge Snapshot: THIRD STREET

The THIRD STREET bridge in Otero, Colorado carries THIRD STREET over ANDERSON ARROYO. It was built in 1931, making it 95 years old today. It was last reconstructed in 1934, extending its service life. The structure is built primarily of steel and spans 3 sections, stretching 37.4 meters (123 feet) end to end. Daily traffic averages 3,981 vehicles, placing it in the moderately-trafficked tier of Colorado bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 22.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How THIRD STREET compares

▼ 14.3
Load rating vs Colorado average (37.1 t)
Bottom 15%
Lower load rating than 85% of Colorado bridges
195
Bridges in Otero · 20 in Poor condition
THIRD STREET 22.8 t
Colorado average 37.1 t

Live comparison across Colorado.

Historical Sufficiency Rating

PlainBridge-computed
58.7 / 100 - historical 50–79.9 band
Structural adequacy /55
20.3
Serviceability /30
27.0
Essentiality /15
14.3
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
22.8 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1931
Last Reconstructed
1934
Material
Steel
Number of Spans
3
Structure Length
37.4 m (123 ft)
Deck Width
15.3 m (50 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
3,981 vehicles/day
Structure Number
LJ 4-THIRD ST.

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

THIRD STREET is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare THIRD STREET against other structures in Otero and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for THIRD STREET?

THIRD STREET in Otero, Colorado has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is THIRD STREET inspected?

THIRD STREET's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,981 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. THIRD STREET is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for THIRD STREET?

THIRD STREET has an NBI inventory load rating of 22.8 metric tons.

Who is responsible for maintaining THIRD STREET?

THIRD STREET is owned and maintained by City/Municipal Highway Agency.

How old is THIRD STREET and does age affect safety?

THIRD STREET was built in 1931, making it 95 years old and last reconstructed in 1934.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.