FHWA NBI 2024 Inspection record Public-domain dataset

FIRST ST/FAS 2685

Carrying FIRST ST/FAS 2685 over LITTLE BLUE RIVER

HEBRON 1ST @ JEFFERSON, Thayer, Nebraska

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
24 t Inventory load rating

Bridge Snapshot: FIRST ST/FAS 2685

The FIRST ST/FAS 2685 bridge in Thayer, Nebraska carries FIRST ST/FAS 2685 over LITTLE BLUE RIVER. It was built in 1981, making it 45 years old today. The structure is built primarily of steel continuous and spans 4 sections, stretching 104.2 meters (342 feet) end to end. Daily traffic averages 1,045 vehicles, placing it in the moderately-trafficked tier of Nebraska bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 7/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 24.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FIRST ST/FAS 2685 compares

▼ 3.7
Load rating vs Nebraska average (27.7 t)
Bottom 43%
Lower load rating than 57% of Nebraska bridges
220
Bridges in Thayer · 11 in Poor condition
FIRST ST/FAS 2685 24.0 t
Nebraska average 27.7 t

Live comparison across Nebraska.

Historical Sufficiency Rating

PlainBridge-computed
80.5 / 100 - historical 80–100 band
Structural adequacy /55
47.1
Serviceability /30
19.6
Essentiality /15
13.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
24.0 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1981
Material
Steel Continuous
Number of Spans
4
Structure Length
104.2 m (342 ft)
Deck Width
9.8 m (32 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
1,045 vehicles/day
Structure Number
M117002513

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 8/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether FIRST ST/FAS 2685 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FIRST ST/FAS 2685 against other structures in Thayer and across Nebraska. Nebraska bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FIRST ST/FAS 2685?

FIRST ST/FAS 2685 in Thayer, Nebraska has a deck rating of 8/9, superstructure rating of 7/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is FIRST ST/FAS 2685 inspected?

FIRST ST/FAS 2685's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,045 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FIRST ST/FAS 2685 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FIRST ST/FAS 2685?

FIRST ST/FAS 2685 has an NBI inventory load rating of 24.0 metric tons.

Who is responsible for maintaining FIRST ST/FAS 2685?

FIRST ST/FAS 2685 is owned and maintained by City/Municipal Highway Agency.

How old is FIRST ST/FAS 2685 and does age affect safety?

FIRST ST/FAS 2685 was built in 1981, making it 45 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.