FHWA NBI 2024 Inspection record Public-domain dataset

HWY DAVIS RD

Carrying HWY DAVIS RD over WATER LYONS BROOK

AT WENDELL TOWN LINE, Franklin, Massachusetts

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
45 t Inventory load rating

Bridge Snapshot: HWY DAVIS RD

The HWY DAVIS RD bridge in Franklin, Massachusetts carries HWY DAVIS RD over WATER LYONS BROOK. It was built in 2004, making it 22 years old today. The structure is built primarily of steel and spans 1 section, stretching 14.5 meters (48 feet) end to end. Daily traffic averages 60 vehicles, placing it in the lower-traffic tier of Massachusetts bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 45.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How HWY DAVIS RD compares

▲ 4.0
Load rating vs Massachusetts average (41.2 t)
Top 29%
Higher load rating than 71% of Massachusetts bridges
314
Bridges in Franklin · 35 in Poor condition
HWY DAVIS RD 45.2 t
Massachusetts average 41.2 t

Live comparison across Massachusetts.

Historical Sufficiency Rating

PlainBridge-computed
100.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
45.2 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2004
Material
Steel
Number of Spans
1
Structure Length
14.5 m (48 ft)
Deck Width
8.2 m (27 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
60 vehicles/day
Structure Number
M28035AP9MUNNBI

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether HWY DAVIS RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare HWY DAVIS RD against other structures in Franklin and across Massachusetts. Massachusetts bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HWY DAVIS RD?

HWY DAVIS RD in Franklin, Massachusetts has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is HWY DAVIS RD inspected?

HWY DAVIS RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 60 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HWY DAVIS RD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HWY DAVIS RD?

HWY DAVIS RD has an NBI inventory load rating of 45.2 metric tons.

Who is responsible for maintaining HWY DAVIS RD?

HWY DAVIS RD is owned and maintained by Town/Township Highway Agency.

How old is HWY DAVIS RD and does age affect safety?

HWY DAVIS RD was built in 2004, making it 22 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.