FHWA NBI 2024 Inspection record Public-domain dataset

ST 3 NB PLGM HWY

Carrying ST 3 NB PLGM HWY over HWY HIGH ST

1 MI N OF JCT RTE 53 & 3, Plymouth, Massachusetts

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
52 t Inventory load rating Higher than 83% of rated Massachusetts bridges

ST 3 NB PLGM HWY in Plymouth, Massachusetts sits above 83% of rated Massachusetts bridges on inventory load rating (52 t), while its 2019 build year is earlier than 1% of Plymouth's recorded-year cohort (287 bridges).

ST 3 NB PLGM HWY in Plymouth, Massachusetts is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2019, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 8. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure MA:N24003BRBDOTNBI

POST-2000 · STEEL · SINGLE-SPAN · TIED-CTRL · HEAVY-ADT · HEAVY-LOAD · CAT-GOOD

  • POST-2000 2000+
  • STEEL Steel
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • HEAVY-LOAD Heavy load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: ST 3 NB PLGM HWY

The ST 3 NB PLGM HWY bridge in Plymouth, Massachusetts carries ST 3 NB PLGM HWY over HWY HIGH ST. It was built in 2019, making it 7 years old today. The structure is built primarily of steel and spans 1 section, stretching 33.2 meters (109 feet) end to end. Daily traffic averages 69,698 vehicles, placing it in the heavily-trafficked tier of Massachusetts bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How ST 3 NB PLGM HWY compares

▲ 11.4
Load rating vs Massachusetts average (40.4 t; 5,295 rated)
287
Bridges in Plymouth · 17 in Poor condition

Age against the county: built in 2019, earlier than 2 of Plymouth's 287 bridges with a recorded construction year (1%), against a county median build year of 1962. This is one of the newer structures in its county.

ST 3 NB PLGM HWY 51.8 t
Massachusetts average (5,295 rated) 40.4 t

Live comparison across Massachusetts bridges with a recorded inventory load rating (5,295 rated).

ST 3 NB PLGM HWY vs every rated Massachusetts bridge

Inventory load rating (metric tons), FHWA NBI, this state

52 Top 17% higher than 83% of 5,295 bridges

rated Massachusetts bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
51.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Plymouth inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 287 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2019
Material
Steel
Number of Spans
1
Structure Length
33.2 m (109 ft)
Deck Width
18.1 m (59 ft)
Owner
State Highway Agency
Avg Daily Traffic
69,698 vehicles/day
Structure Number
N24003BRBDOTNBI

Condition Analysis

  • The deck (driving surface) rates good at 8/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • At 8/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether ST 3 NB PLGM HWY is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare ST 3 NB PLGM HWY against other structures in Plymouth and across Massachusetts. Massachusetts bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ST 3 NB PLGM HWY?

ST 3 NB PLGM HWY in Plymouth, Massachusetts has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is ST 3 NB PLGM HWY inspected?

ST 3 NB PLGM HWY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 69,698 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ST 3 NB PLGM HWY is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ST 3 NB PLGM HWY?

ST 3 NB PLGM HWY has an NBI inventory load rating of 51.8 metric tons.

Who is responsible for maintaining ST 3 NB PLGM HWY?

ST 3 NB PLGM HWY is owned and maintained by State Highway Agency.

How old is ST 3 NB PLGM HWY and does age affect safety?

ST 3 NB PLGM HWY was built in 2019, making it 7 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.