FHWA NBI 2024 Inspection record Public-domain dataset

HWY PROSPECT AVE

Carrying HWY PROSPECT AVE over RR PVRR

.1 M E WESTFIELD T.L., Hampden, Massachusetts

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
2 t Inventory load rating Lower than 99% of rated Massachusetts bridges

HWY PROSPECT AVE in Hampden, Massachusetts sits above 1% of rated Massachusetts bridges on inventory load rating (2 t), while its 1926 build year is earlier than 89% of Hampden's recorded-year cohort (428 bridges).

HWY PROSPECT AVE in Hampden, Massachusetts is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1926, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 3. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure MA:W2101114WDOT634

PRE-1950 · TIMBER · SINGLE-SPAN · DECK-LED · ADT-UNK · LIGHT-LOAD · CAT-POOR

  • PRE-1950 Pre-1950
  • TIMBER Wood or timber
  • SINGLE-SPAN Single span
  • DECK-LED Deck-led
  • ADT-UNK ADT unknown
  • LIGHT-LOAD Light load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: HWY PROSPECT AVE

The HWY PROSPECT AVE bridge in Hampden, Massachusetts carries HWY PROSPECT AVE over RR PVRR. It was built in 1926, making it 100 years old today. The structure is built primarily of wood or timber and spans 1 section, stretching 8.1 meters (27 feet) end to end. Average daily traffic is not reported for this structure. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 3/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order.

How HWY PROSPECT AVE compares

▼ 38.5
Load rating vs Massachusetts average (40.4 t; 5,295 rated)
428
Bridges in Hampden · 32 in Poor condition

Age against the county: built in 1926, earlier than 379 of Hampden's 428 bridges with a recorded construction year (89%), against a county median build year of 1957. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

HWY PROSPECT AVE 1.9 t
Massachusetts average (5,295 rated) 40.4 t

Live comparison across Massachusetts bridges with a recorded inventory load rating (5,295 rated).

HWY PROSPECT AVE vs every rated Massachusetts bridge

Inventory load rating (metric tons), FHWA NBI, this state

2 Top 99% higher than 1% of 5,295 bridges

rated Massachusetts bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
3/9
Poor (1–4)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
1.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Hampden inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 428 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1926
Material
Wood or Timber
Number of Spans
1
Structure Length
8.1 m (27 ft)
Deck Width
6.5 m (21 ft)
Owner
State Highway Agency
Structure Number
W2101114WDOT634

Condition Analysis

  • The deck (driving surface) rates poor at 3/9, with advanced deterioration recorded on the latest inspection.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration on the inspecting agency's 0-9 scale.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

HWY PROSPECT AVE is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare HWY PROSPECT AVE against other structures in Hampden and across Massachusetts. Massachusetts bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HWY PROSPECT AVE?

HWY PROSPECT AVE in Hampden, Massachusetts has a deck rating of 3/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is HWY PROSPECT AVE inspected?

HWY PROSPECT AVE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HWY PROSPECT AVE is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HWY PROSPECT AVE?

HWY PROSPECT AVE has an NBI inventory load rating of 1.9 metric tons.

Who is responsible for maintaining HWY PROSPECT AVE?

HWY PROSPECT AVE is owned and maintained by State Highway Agency.

How old is HWY PROSPECT AVE and does age affect safety?

HWY PROSPECT AVE was built in 1926, making it 100 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.