FHWA NBI 2024 Inspection record Public-domain dataset

HWY MCKEON RD

Carrying HWY MCKEON RD over WATER MIDDLE RIVER

250 FT S OF RIVERSIDE ST, Worcester, Massachusetts

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
48 t Inventory load rating Higher than 78% of rated Massachusetts bridges

HWY MCKEON RD in Worcester, Massachusetts sits above 78% of rated Massachusetts bridges on inventory load rating (48 t), while its 1924 build year is earlier than 91% of Worcester's recorded-year cohort (1,014 bridges).

HWY MCKEON RD in Worcester, Massachusetts is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1924, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure MA:W440321E3MUNNBI

PRE-1950 · PRESTRESS · MULTI-SPAN · TIED-CTRL · HEAVY-ADT · HEAVY-LOAD · CAT-FAIR

  • PRE-1950 Pre-1950
  • PRESTRESS Prestressed concrete
  • MULTI-SPAN 3 spans
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • HEAVY-LOAD Heavy load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: HWY MCKEON RD

The HWY MCKEON RD bridge in Worcester, Massachusetts carries HWY MCKEON RD over WATER MIDDLE RIVER. It was built in 1924, making it 102 years old today. It was last reconstructed in 1987, extending its service life. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 25.4 meters (83 feet) end to end. Daily traffic averages 10,100 vehicles, placing it in the heavily-trafficked tier of Massachusetts bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How HWY MCKEON RD compares

▲ 8.0
Load rating vs Massachusetts average (40.4 t; 5,295 rated)
1,014
Bridges in Worcester · 77 in Poor condition

Age against the county: built in 1924, earlier than 926 of Worcester's 1,014 bridges with a recorded construction year (91%), against a county median build year of 1962. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

HWY MCKEON RD 48.4 t
Massachusetts average (5,295 rated) 40.4 t

Live comparison across Massachusetts bridges with a recorded inventory load rating (5,295 rated).

HWY MCKEON RD vs every rated Massachusetts bridge

Inventory load rating (metric tons), FHWA NBI, this state

48 Top 22% higher than 78% of 5,295 bridges

rated Massachusetts bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
48.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Worcester inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 1,014 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1924
Last Reconstructed
1987
Material
Prestressed Concrete
Number of Spans
3
Structure Length
25.4 m (83 ft)
Deck Width
19.2 m (63 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
10,100 vehicles/day
Structure Number
W440321E3MUNNBI

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether HWY MCKEON RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare HWY MCKEON RD against other structures in Worcester and across Massachusetts. Massachusetts bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HWY MCKEON RD?

HWY MCKEON RD in Worcester, Massachusetts has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is HWY MCKEON RD inspected?

HWY MCKEON RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10,100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HWY MCKEON RD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HWY MCKEON RD?

HWY MCKEON RD has an NBI inventory load rating of 48.4 metric tons.

Who is responsible for maintaining HWY MCKEON RD?

HWY MCKEON RD is owned and maintained by City/Municipal Highway Agency.

How old is HWY MCKEON RD and does age affect safety?

HWY MCKEON RD was built in 1924, making it 102 years old and last reconstructed in 1987.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.