FHWA NBI 2024 Inspection record Public-domain dataset

UPPER POTOMAC INDU

Carrying UPPER POTOMAC INDU over CSXT RAILROAD

0.08 MI E OF US 220, Allegany, Maryland

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
50 t Inventory load rating Higher than 60% of rated Maryland bridges

UPPER POTOMAC INDU in Allegany, Maryland sits above 60% of rated Maryland bridges on inventory load rating (50 t), while its 1975 build year is earlier than 47% of Allegany's recorded-year cohort (245 bridges).

UPPER POTOMAC INDU in Allegany, Maryland is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1975, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure MD:200000A-0119010

INTERSTATE-ERA · STEEL · MULTI-SPAN · SUB-LED · LOCAL-ADT · HEAVY-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • MULTI-SPAN 3 spans
  • SUB-LED Substructure-led
  • LOCAL-ADT Local ADT
  • HEAVY-LOAD Heavy load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: UPPER POTOMAC INDU

The UPPER POTOMAC INDU bridge in Allegany, Maryland carries UPPER POTOMAC INDU over CSXT RAILROAD. It was built in 1975, making it 51 years old today. The structure is built primarily of steel continuous and spans 3 sections, stretching 59.7 meters (196 feet) end to end. Daily traffic averages 120 vehicles, placing it in the lower-traffic tier of Maryland bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How UPPER POTOMAC INDU compares

▼ 0.2
Load rating vs Maryland average (50.1 t; 5,479 of 5,484 rated)
245
Bridges in Allegany · 15 in Poor condition

Age against the county: built in 1975, earlier than 114 of Allegany's 245 bridges with a recorded construction year (47%), against a county median build year of 1973. This is one of the newer structures in its county.

UPPER POTOMAC INDU 49.9 t
Maryland average (5,479 of 5,484 rated) 50.1 t

Live comparison across Maryland bridges with a recorded inventory load rating (5,479 of 5,484 rated).

UPPER POTOMAC INDU vs every rated Maryland bridge

Inventory load rating (metric tons), FHWA NBI, this state

50 Top 40% higher than 60% of 5,479 bridges

rated Maryland bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
49.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Allegany inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 245 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1975
Material
Steel Continuous
Number of Spans
3
Structure Length
59.7 m (196 ft)
Deck Width
14.4 m (47 ft)
Owner
County Highway Agency
Avg Daily Traffic
120 vehicles/day
Structure Number
200000A-0119010

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether UPPER POTOMAC INDU is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare UPPER POTOMAC INDU against other structures in Allegany and across Maryland. Maryland bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for UPPER POTOMAC INDU?

UPPER POTOMAC INDU in Allegany, Maryland has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is UPPER POTOMAC INDU inspected?

UPPER POTOMAC INDU's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 120 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. UPPER POTOMAC INDU is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for UPPER POTOMAC INDU?

UPPER POTOMAC INDU has an NBI inventory load rating of 49.9 metric tons.

Who is responsible for maintaining UPPER POTOMAC INDU?

UPPER POTOMAC INDU is owned and maintained by County Highway Agency.

How old is UPPER POTOMAC INDU and does age affect safety?

UPPER POTOMAC INDU was built in 1975, making it 51 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.