FHWA NBI 2024 Inspection record Public-domain dataset

PINEY GROVE ROAD

Carrying PINEY GROVE ROAD over CSX RAILROAD

0.1 MI SE OF OLD HANOVER, Baltimore, Maryland

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
14 t Inventory load rating Lower than 99% of rated Maryland bridges

PINEY GROVE ROAD in Baltimore, Maryland sits above 1% of rated Maryland bridges on inventory load rating (14 t), while its 1907 build year is earlier than 98% of Baltimore's recorded-year cohort (783 bridges).

PINEY GROVE ROAD in Baltimore, Maryland is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1907, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure MD:200000B-0140010

PRE-1950 · TIMBER · MULTI-SPAN · SUB-LED · LOCAL-ADT · LIGHT-LOAD · CAT-POOR

  • PRE-1950 Pre-1950
  • TIMBER Wood or timber
  • MULTI-SPAN 3 spans
  • SUB-LED Substructure-led
  • LOCAL-ADT Local ADT
  • LIGHT-LOAD Light load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: PINEY GROVE ROAD

The PINEY GROVE ROAD bridge in Baltimore, Maryland carries PINEY GROVE ROAD over CSX RAILROAD. It was built in 1907, making it 119 years old today. It was last reconstructed in 2001, extending its service life. The structure is built primarily of wood or timber and spans 3 sections, stretching 14.0 meters (46 feet) end to end. Daily traffic averages 551 vehicles, placing it in the lower-traffic tier of Maryland bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 6/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules.

How PINEY GROVE ROAD compares

▼ 36.0
Load rating vs Maryland average (50.1 t; 5,479 of 5,484 rated)
783
Bridges in Baltimore · 25 in Poor condition

Age against the county: built in 1907, earlier than 767 of Baltimore's 783 bridges with a recorded construction year (98%), against a county median build year of 1971. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

PINEY GROVE ROAD 14.1 t
Maryland average (5,479 of 5,484 rated) 50.1 t

Live comparison across Maryland bridges with a recorded inventory load rating (5,479 of 5,484 rated).

PINEY GROVE ROAD vs every rated Maryland bridge

Inventory load rating (metric tons), FHWA NBI, this state

14 Top 99% higher than 1% of 5,479 bridges

rated Maryland bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
14.1 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Baltimore inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 783 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1907
Last Reconstructed
2001
Material
Wood or Timber
Number of Spans
3
Structure Length
14.0 m (46 ft)
Deck Width
5.5 m (18 ft)
Owner
County Highway Agency
Avg Daily Traffic
551 vehicles/day
Structure Number
200000B-0140010

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear on file for this vintage.

How to read this record

PINEY GROVE ROAD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare PINEY GROVE ROAD against other structures in Baltimore and across Maryland. Maryland bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PINEY GROVE ROAD?

PINEY GROVE ROAD in Baltimore, Maryland has a deck rating of 5/9, superstructure rating of 6/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is PINEY GROVE ROAD inspected?

PINEY GROVE ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 551 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PINEY GROVE ROAD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PINEY GROVE ROAD?

PINEY GROVE ROAD has an NBI inventory load rating of 14.1 metric tons.

Who is responsible for maintaining PINEY GROVE ROAD?

PINEY GROVE ROAD is owned and maintained by County Highway Agency.

How old is PINEY GROVE ROAD and does age affect safety?

PINEY GROVE ROAD was built in 1907, making it 119 years old and last reconstructed in 2001.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.