I 295 NB
Carrying I 295 NB over ROUTE US 1 NB &SB
1 MI N RTE 88, Cumberland, Maine
Inventory: FHWA NBI 2024 · last ETL August 2026
FHWA NBI record, refreshed with each annual release.
I 295 NB in Cumberland, Maine sits above 26% of rated Maine bridges on inventory load rating (31 t), while its 1959 build year is earlier than 63% of Cumberland's recorded-year cohort (344 bridges).
I 295 NB in Cumberland, Maine is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1959, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.
NBI record plate
Structure ME:5833
INTERSTATE-ERA · STEEL · SINGLE-SPAN · TIED-CTRL · HEAVY-ADT · STANDARD-LOAD · CAT-POOR
- INTERSTATE-ERA 1950–1979
- STEEL Steel
- SINGLE-SPAN Single span
- TIED-CTRL Tied control
- HEAVY-ADT Heavy ADT
- STANDARD-LOAD Standard load
- CAT-POOR Poor
Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.
Bridge Snapshot: I 295 NB
The I 295 NB bridge in Cumberland, Maine carries I 295 NB over ROUTE US 1 NB &SB. It was built in 1959, making it 67 years old today. It was last reconstructed in 1991, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 85.0 meters (279 feet) end to end. Daily traffic averages 24,130 vehicles, placing it in the heavily-trafficked tier of Maine bridges. It is owned and maintained by State Highway Agency.
The latest FHWA inspection records show a deck rating of 4/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules.
How I 295 NB compares
Age against the county: built in 1959, earlier than 215 of Cumberland's 344 bridges with a recorded construction year (63%), against a county median build year of 1971. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.
Live comparison across Maine bridges with a recorded inventory load rating (2,518 rated).
I 295 NB vs every rated Maine bridge
Inventory load rating (metric tons), FHWA NBI, this state
31 Top 74% higher than 26% of 2,518 bridges
rated Maine bridges, bucketed by value
Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.
Source FHWA National Bridge Inventory · August 2026
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.
Cumberland inventory by recorded NBI category
Exclusive Good/Fair/Poor bands across all 344 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.
Structural Details
- Year Built
- 1959
- Last Reconstructed
- 1991
- Material
- Steel
- Number of Spans
- 1
- Structure Length
- 85.0 m (279 ft)
- Deck Width
- 10.7 m (35 ft)
- Owner
- State Highway Agency
- Avg Daily Traffic
- 24,130 vehicles/day
- Structure Number
- 5833
Condition Analysis
- • The deck (driving surface) is in poor condition (4/9), showing advanced deterioration on the inspecting agency's 0-9 scale.
- • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
- • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear on file for this vintage.
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
I 295 NB is in the federal Poor condition category. That is a component-based result, not a closure order.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
- Compare I 295 NB against other structures in Cumberland and across Maine. Maine bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for I 295 NB?
I 295 NB in Cumberland, Maine has a deck rating of 4/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.
How often is I 295 NB inspected?
I 295 NB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 24,130 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. I 295 NB is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for I 295 NB?
I 295 NB has an NBI inventory load rating of 31.1 metric tons.
Who is responsible for maintaining I 295 NB?
I 295 NB is owned and maintained by State Highway Agency.
How old is I 295 NB and does age affect safety?
I 295 NB was built in 1959, making it 67 years old and last reconstructed in 1991.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Share this inspection record
Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.
Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.