FHWA NBI 2024 Inspection record Public-domain dataset

WB METRO PARKWAY

Carrying WB METRO PARKWAY over RED RUN DRAIN

0.1 MI WEST OF UTICA RD, Macomb, Michigan

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
52 t Inventory load rating Higher than 82% of rated Michigan bridges

WB METRO PARKWAY in Macomb, Michigan sits above 82% of rated Michigan bridges on inventory load rating (52 t), while its 1969 build year is earlier than 68% of Macomb's recorded-year cohort (417 bridges).

WB METRO PARKWAY in Macomb, Michigan is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1969, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure MI:000000000006196

INTERSTATE-ERA · PRESTRESS · LONG-SPAN-RUN · SUB-LED · HEAVY-ADT · HEAVY-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • LONG-SPAN-RUN 4 spans
  • SUB-LED Substructure-led
  • HEAVY-ADT Heavy ADT
  • HEAVY-LOAD Heavy load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: WB METRO PARKWAY

The WB METRO PARKWAY bridge in Macomb, Michigan carries WB METRO PARKWAY over RED RUN DRAIN. It was built in 1969, making it 57 years old today. It was last reconstructed in 2005, extending its service life. The structure is built primarily of prestressed concrete and spans 4 sections, stretching 58.7 meters (193 feet) end to end. Daily traffic averages 21,115 vehicles, placing it in the heavily-trafficked tier of Michigan bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 5/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How WB METRO PARKWAY compares

▲ 10.6
Load rating vs Michigan average (41.2 t; 11,366 of 11,371 rated)
417
Bridges in Macomb · 32 in Poor condition

Age against the county: built in 1969, earlier than 283 of Macomb's 417 bridges with a recorded construction year (68%), against a county median build year of 1976. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

WB METRO PARKWAY 51.8 t
Michigan average (11,366 of 11,371 rated) 41.2 t

Live comparison across Michigan bridges with a recorded inventory load rating (11,366 of 11,371 rated).

WB METRO PARKWAY vs every rated Michigan bridge

Inventory load rating (metric tons), FHWA NBI, this state

52 Top 18% higher than 82% of 11,366 bridges

rated Michigan bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
51.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Macomb inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 417 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1969
Last Reconstructed
2005
Material
Prestressed Concrete
Number of Spans
4
Structure Length
58.7 m (193 ft)
Deck Width
17.6 m (58 ft)
Owner
County Highway Agency
Avg Daily Traffic
21,115 vehicles/day
Structure Number
000000000006196

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether WB METRO PARKWAY is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare WB METRO PARKWAY against other structures in Macomb and across Michigan. Michigan bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for WB METRO PARKWAY?

WB METRO PARKWAY in Macomb, Michigan has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is WB METRO PARKWAY inspected?

WB METRO PARKWAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 21,115 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. WB METRO PARKWAY is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for WB METRO PARKWAY?

WB METRO PARKWAY has an NBI inventory load rating of 51.8 metric tons.

Who is responsible for maintaining WB METRO PARKWAY?

WB METRO PARKWAY is owned and maintained by County Highway Agency.

How old is WB METRO PARKWAY and does age affect safety?

WB METRO PARKWAY was built in 1969, making it 57 years old and last reconstructed in 2005.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.