FHWA NBI 2026 Inspection record Public-domain dataset

HWY LINWOOD AVE

Carrying HWY LINWOOD AVE over WATER LINWOOD POND

NEAR UXBRIDGE LINE, Worcester, Massachusetts

FHWA NBI inspection record for this structure. Condition ratings, inventory load rating, span, deck width, and average daily traffic refresh annually with each NBI release.

Poor
19 t Inventory load rating

Bridge Snapshot: HWY LINWOOD AVE

The HWY LINWOOD AVE bridge in Worcester, Massachusetts carries HWY LINWOOD AVE over WATER LINWOOD POND. It was built in 1923, making it 103 years old today. The structure is built primarily of steel and spans 1 section, stretching 7.3 meters (24 feet) end to end. Daily traffic averages 7,363 vehicles, placing it in the moderately-trafficked tier of Massachusetts bridges. It is owned and maintained by Town/Township Highway Agency, the entity responsible for routine inspections and any needed repairs.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 5/9, substructure at 4/9 on the 0–9 NBI scale, where 9 is excellent and 0 is failed. The weakest component sits in poor condition, which drives the overall status of this bridge. Because at least one major component scores 4 or lower, the FHWA classifies this bridge as structurally deficient — a maintenance flag, not a closure order. Its NBI inventory load rating is 18.8 metric tons — the load level the structure is rated to carry at inventory (long-term) level.

In a county that maintains hundreds of NBI-tracked bridges, HWY LINWOOD AVE is one data point in a Massachusetts inventory that FHWA inspects on a two-year cycle (more often when ratings fall). Bridge age alone is not a reliable safety signal — a 103-era structure can outperform a newer one when maintenance is consistent, materials are sound, and traffic loads stay within design limits. Use the condition ratings above, the sufficiency score, and the structurally-deficient flag together to read the bridge's real status, and check the linked county and state pages to see how this bridge ranks against its peers.

Every figure on this page comes directly from the Federal Highway Administration National Bridge Inventory (NBI), the public dataset that catalogs more than 617,000 highway bridges across the United States and is updated annually from the records that each state Department of Transportation submits to the FHWA. The condition codes use the standardized FHWA Recording and Coding Guide, the same scale that determines federal eligibility for the Highway Bridge Program and the Surface Transportation Block Grant set-aside for off-system bridges. A "structurally deficient" classification under those federal criteria is a maintenance and funding flag, never a closure order; states keep deficient bridges open with load posting, weight limits, or accelerated inspection cycles until rehabilitation or replacement is funded. See our methodology for refresh cadence and the exact NBI release vintage powering each record.

How HWY LINWOOD AVE compares

▼ 22.4
Load rating vs Massachusetts average (41.2 t)
Bottom 4%
Lower load rating than 96% of Massachusetts bridges
1,016
Bridges in Worcester · 74 structurally deficient
HWY LINWOOD AVE 18.8 t
Massachusetts average 41.2 t

NBI inventory load rating (metric tons) and structural-deficiency status compared across Massachusetts, computed live from the FHWA NBI.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
18.8 t
NBI inventory level (metric tons)
SD Status
Structurally Deficient

Ratings are on a 0–9 scale: 9 = Excellent, 7–8 = Good, 5–6 = Fair, 3–4 = Poor, 0–2 = Critical/Failed. Sufficiency rating (0–100) combines structural adequacy, functional obsolescence, and essentiality.

Structural Details

Year Built
1923
Material
Steel
Number of Spans
1
Structure Length
7.3 m (24 ft)
Deck Width
14.8 m (49 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
7,363 vehicles/day
Structure Number
N210161D1MUNNBI

Location

NEAR UXBRIDGE LINE, Worcester, Massachusetts
42.099100, -71.646511
View on Google Maps ↗

Data Source

Data from the FHWA National Bridge Inventory (NBI). Bridge inspections are required every two years by federal law. Conditions reflect the most recent inspection.

FHWA NBI Program ↗

Condition Analysis

Built in 1923, this bridge is 103 years old. It carries approximately 7,363 vehicles per day. Based on the most recent FHWA inspection:

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

Its NBI inventory load rating is low, indicating a load-restricted structure. This bridge is classified as structurally deficient, meaning at least one major component is rated in poor condition. This does not mean the bridge is unsafe — it means it requires repair or monitoring.

Frequently Asked Questions

What do the condition ratings mean for HWY LINWOOD AVE?

Bridge condition ratings use a 0–9 scale set by the Federal Highway Administration (FHWA). Ratings 7–9 indicate good condition with no significant problems. Ratings 5–6 mean fair condition with minor issues. Ratings 3–4 indicate poor condition requiring repair. Ratings 0–2 are critical, meaning the bridge has serious structural problems. HWY LINWOOD AVE in Worcester, Massachusetts has a deck rating of 7/9, superstructure rating of 5/9, and substructure rating of 4/9.

How often is HWY LINWOOD AVE inspected?

Federal law requires most highway bridges to be inspected at least every 24 months. Bridges in poor condition or with known issues may be inspected more frequently (every 12 months or less). HWY LINWOOD AVE is part of the National Bridge Inventory maintained by the FHWA. With 7,363 vehicles crossing daily, regular inspection is essential.

What does "structurally deficient" mean for a bridge?

A structurally deficient bridge has at least one major component (deck, superstructure, or substructure) rated 4 or below on the FHWA 0–9 scale. This classification does NOT mean the bridge is unsafe for travel — it means the bridge needs repair, rehabilitation, or eventual replacement. Structurally deficient bridges remain open and are monitored. HWY LINWOOD AVE is currently classified as structurally deficient.

What is the inventory load rating for HWY LINWOOD AVE?

The NBI inventory rating is the load level a bridge is rated to carry for an indefinite period, recorded in metric tons. A lower number means the structure is more load-restricted. HWY LINWOOD AVE has an inventory load rating of 18.8 metric tons. It is distinct from the FHWA sufficiency rating, a separate 0–100 funding-eligibility score that this dataset does not include.

Who is responsible for maintaining HWY LINWOOD AVE?

Bridge ownership and maintenance responsibility varies — bridges may be owned by state DOTs, counties, cities, railroads, or federal agencies. HWY LINWOOD AVE is maintained by Town/Township Highway Agency. The FHWA oversees the National Bridge Inventory program and sets inspection standards, but day-to-day maintenance falls to the owning agency. If you notice damage or safety concerns, contact your state DOT or call 911 for emergencies.

How old is HWY LINWOOD AVE and does age affect safety?

HWY LINWOOD AVE was built in 1923, making it 103 years old. Bridge age alone does not determine safety — condition depends on materials, design, traffic load, maintenance history, and environmental exposure. Many older bridges remain in good condition due to regular maintenance and reconstruction.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A structurally deficient rating does not mean a bridge is closed or unsafe for travel — it indicates the bridge requires repair or replacement. For current closure or safety information, contact your state DOT.

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial