FHWA NBI 2024 Inspection record Public-domain dataset

I-5 (HWY 001) NB

Carrying I-5 (HWY 001) NB over UPRR

0.2 MI N OF BURNSIDE BR, Multnomah, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
14 t Inventory load rating

Bridge Snapshot: I-5 (HWY 001) NB

The I-5 (HWY 001) NB bridge in Multnomah, Oregon carries I-5 (HWY 001) NB over UPRR. It was built in 1963, making it 63 years old today. The structure is built primarily of steel and spans 22 sections, stretching 686.1 meters (2251 feet) end to end. Daily traffic averages 33,663 vehicles, placing it in the heavily-trafficked tier of Oregon bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 14.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How I-5 (HWY 001) NB compares

▼ 18.0
Load rating vs Oregon average (32.3 t)
Bottom 7%
Lower load rating than 93% of Oregon bridges
474
Bridges in Multnomah · 12 in Poor condition
I-5 (HWY 001) NB 14.3 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
43.5 / 100 - historical 20–49.9 band
Structural adequacy /55
29.9
Serviceability /30
10.5
Essentiality /15
3.1
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
14.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1963
Material
Steel
Number of Spans
22
Structure Length
686.1 m (2251 ft)
Deck Width
10.3 m (34 ft)
Owner
State Highway Agency
Avg Daily Traffic
33,663 vehicles/day
Structure Number
N8588E001 30170

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether I-5 (HWY 001) NB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare I-5 (HWY 001) NB against other structures in Multnomah and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I-5 (HWY 001) NB?

I-5 (HWY 001) NB in Multnomah, Oregon has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is I-5 (HWY 001) NB inspected?

I-5 (HWY 001) NB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 33,663 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I-5 (HWY 001) NB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I-5 (HWY 001) NB?

I-5 (HWY 001) NB has an NBI inventory load rating of 14.3 metric tons.

Who is responsible for maintaining I-5 (HWY 001) NB?

I-5 (HWY 001) NB is owned and maintained by State Highway Agency.

How old is I-5 (HWY 001) NB and does age affect safety?

I-5 (HWY 001) NB was built in 1963, making it 63 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.