FHWA NBI 2024 Inspection record Public-domain dataset

NC24 27 73 EBL

Carrying NC24 27 73 EBL over PEE DEE RIVER

0.1 MI. E. JCT. SR1803, Stanly, North Carolina

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
49 t Inventory load rating Higher than 68% of rated North Carolina bridges

NC24 27 73 EBL in Stanly, North Carolina sits above 68% of rated North Carolina bridges on inventory load rating (49 t), while its 1979 build year is earlier than 60% of Stanly's recorded-year cohort (163 bridges).

NC24 27 73 EBL in Stanly, North Carolina is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1979, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure NC:000000001670050

INTERSTATE-ERA · STEEL · LONG-SPAN-RUN · SUB-LED · ARTERIAL-ADT · HEAVY-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • LONG-SPAN-RUN 6 spans
  • SUB-LED Substructure-led
  • ARTERIAL-ADT Arterial ADT
  • HEAVY-LOAD Heavy load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: NC24 27 73 EBL

The NC24 27 73 EBL bridge in Stanly, North Carolina carries NC24 27 73 EBL over PEE DEE RIVER. It was built in 1979, making it 47 years old today. It was last reconstructed in 2021, extending its service life. The structure is built primarily of steel continuous and spans 6 sections, stretching 347.4 meters (1140 feet) end to end. Daily traffic averages 5,500 vehicles, placing it in the moderately-trafficked tier of North Carolina bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How NC24 27 73 EBL compares

▲ 4.3
Load rating vs North Carolina average (44.6 t; 19,160 of 19,210 rated)
163
Bridges in Stanly · 5 in Poor condition

Age against the county: built in 1979, earlier than 98 of Stanly's 163 bridges with a recorded construction year (60%), against a county median build year of 1986. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

NC24 27 73 EBL 48.9 t
North Carolina average (19,160 of 19,210 rated) 44.6 t

Live comparison across North Carolina bridges with a recorded inventory load rating (19,160 of 19,210 rated).

NC24 27 73 EBL vs every rated North Carolina bridge

Inventory load rating (metric tons), FHWA NBI, this state

49 Top 32% higher than 68% of 19,160 bridges

rated North Carolina bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
48.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Stanly inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 163 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1979
Last Reconstructed
2021
Material
Steel Continuous
Number of Spans
6
Structure Length
347.4 m (1140 ft)
Deck Width
13.0 m (43 ft)
Owner
State Highway Agency
Avg Daily Traffic
5,500 vehicles/day
Structure Number
000000001670050

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether NC24 27 73 EBL is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare NC24 27 73 EBL against other structures in Stanly and across North Carolina. North Carolina bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for NC24 27 73 EBL?

NC24 27 73 EBL in Stanly, North Carolina has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is NC24 27 73 EBL inspected?

NC24 27 73 EBL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. NC24 27 73 EBL is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for NC24 27 73 EBL?

NC24 27 73 EBL has an NBI inventory load rating of 48.9 metric tons.

Who is responsible for maintaining NC24 27 73 EBL?

NC24 27 73 EBL is owned and maintained by State Highway Agency.

How old is NC24 27 73 EBL and does age affect safety?

NC24 27 73 EBL was built in 1979, making it 47 years old and last reconstructed in 2021.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.