FIREBREAK 9
Carrying FIREBREAK 9 over HOURSE CREEK
RANGE V1 AREA, Hoke, North Carolina
Inventory: FHWA NBI 2024 · last ETL August 2026
FHWA NBI record, refreshed with each annual release.
FIREBREAK 9 in Hoke, North Carolina is rated Fair in the FHWA's 2024 National Bridge Inventory.
Built in 1960, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.
NBI record plate
Structure NC:DAPFORBRA0BRD24
INTERSTATE-ERA · TIMBER · MULTI-SPAN · SUB-LED · TRACE-ADT · LOAD-UNK · CAT-FAIR
- INTERSTATE-ERA 1950–1979
- TIMBER Wood or timber
- MULTI-SPAN 3 spans
- SUB-LED Substructure-led
- TRACE-ADT Trace ADT
- LOAD-UNK Load unrated
- CAT-FAIR Fair
Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.
Bridge Snapshot: FIREBREAK 9
The FIREBREAK 9 bridge in Hoke, North Carolina carries FIREBREAK 9 over HOURSE CREEK. It was built in 1960, making it 66 years old today. The structure is built primarily of wood or timber and spans 3 sections, stretching 6.5 meters (21 feet) end to end. Daily traffic averages 1 vehicles, placing it in the lower-traffic tier of North Carolina bridges. It is owned and maintained by NASA.
The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 5/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.
How FIREBREAK 9 compares
Age against the county: built in 1960, earlier than 87 of Hoke's 136 bridges with a recorded construction year (64%), against a county median build year of 1970. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.
Live comparison across North Carolina bridges with a recorded inventory load rating (19,160 of 19,210 rated).
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.
Hoke inventory by recorded NBI category
Exclusive Good/Fair/Poor bands across all 136 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.
Structural Details
- Year Built
- 1960
- Material
- Wood or Timber
- Number of Spans
- 3
- Structure Length
- 6.5 m (21 ft)
- Deck Width
- 4.2 m (14 ft)
- Owner
- NASA
- Avg Daily Traffic
- 1 vehicles/day
- Structure Number
- DAPFORBRA0BRD24
Condition Analysis
- • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
- • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
- • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether FIREBREAK 9 is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare FIREBREAK 9 against other structures in Hoke and across North Carolina. North Carolina bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for FIREBREAK 9?
FIREBREAK 9 in Hoke, North Carolina has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.
How often is FIREBREAK 9 inspected?
FIREBREAK 9's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. FIREBREAK 9 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for FIREBREAK 9?
An inventory load rating is not recorded for FIREBREAK 9.
Who is responsible for maintaining FIREBREAK 9?
FIREBREAK 9 is owned and maintained by NASA.
How old is FIREBREAK 9 and does age affect safety?
FIREBREAK 9 was built in 1960, making it 66 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Share this inspection record
Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.
Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.