FHWA NBI 2024 Inspection record Public-domain dataset

I80/RMP 50/RMP 40

Carrying I80/RMP 50/RMP 40 over UPRR

IN OMAHA, Douglas, Nebraska

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
27 t Inventory load rating Higher than 51% of rated Nebraska bridges

I80/RMP 50/RMP 40 in Douglas, Nebraska sits above 51% of rated Nebraska bridges on inventory load rating (27 t), while its 1962 build year is earlier than 84% of Douglas's recorded-year cohort (509 bridges).

I80/RMP 50/RMP 40 in Douglas, Nebraska is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1962, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure NE:S080 45252

INTERSTATE-ERA · STEEL · LONG-SPAN-RUN · DECK-LED · HEAVY-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • LONG-SPAN-RUN 5 spans
  • DECK-LED Deck-led
  • HEAVY-ADT Heavy ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: I80/RMP 50/RMP 40

The I80/RMP 50/RMP 40 bridge in Douglas, Nebraska carries I80/RMP 50/RMP 40 over UPRR. It was built in 1962, making it 64 years old today. It was last reconstructed in 1989, extending its service life. The structure is built primarily of steel continuous and spans 5 sections, stretching 91.9 meters (302 feet) end to end. Daily traffic averages 176,745 vehicles, placing it in the heavily-trafficked tier of Nebraska bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How I80/RMP 50/RMP 40 compares

▼ 0.4
Load rating vs Nebraska average (27.4 t; 15,392 of 15,398 rated)
509
Bridges in Douglas · 15 in Poor condition

Age against the county: built in 1962, earlier than 430 of Douglas's 509 bridges with a recorded construction year (84%), against a county median build year of 1988. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

I80/RMP 50/RMP 40 27.0 t
Nebraska average (15,392 of 15,398 rated) 27.4 t

Live comparison across Nebraska bridges with a recorded inventory load rating (15,392 of 15,398 rated).

I80/RMP 50/RMP 40 vs every rated Nebraska bridge

Inventory load rating (metric tons), FHWA NBI, this state

27 Top 49% higher than 51% of 15,392 bridges

rated Nebraska bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
27.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Douglas inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 509 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1962
Last Reconstructed
1989
Material
Steel Continuous
Number of Spans
5
Structure Length
91.9 m (302 ft)
Deck Width
66.8 m (219 ft)
Owner
State Highway Agency
Avg Daily Traffic
176,745 vehicles/day
Structure Number
S080 45252

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether I80/RMP 50/RMP 40 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare I80/RMP 50/RMP 40 against other structures in Douglas and across Nebraska. Nebraska bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I80/RMP 50/RMP 40?

I80/RMP 50/RMP 40 in Douglas, Nebraska has a deck rating of 6/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is I80/RMP 50/RMP 40 inspected?

I80/RMP 50/RMP 40's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 176,745 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I80/RMP 50/RMP 40 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I80/RMP 50/RMP 40?

I80/RMP 50/RMP 40 has an NBI inventory load rating of 27.0 metric tons.

Who is responsible for maintaining I80/RMP 50/RMP 40?

I80/RMP 50/RMP 40 is owned and maintained by State Highway Agency.

How old is I80/RMP 50/RMP 40 and does age affect safety?

I80/RMP 50/RMP 40 was built in 1962, making it 64 years old and last reconstructed in 1989.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.