FHWA NBI 2024 Inspection record Public-domain dataset

LOCUST ST/FAS 2235

Carrying LOCUST ST/FAS 2235 over M CH PLATTE RIVER

JCT I80/US34 2E 1N, Hall, Nebraska

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
54 t Inventory load rating Higher than 97% of rated Nebraska bridges

LOCUST ST/FAS 2235 in Hall, Nebraska sits above 97% of rated Nebraska bridges on inventory load rating (54 t), while its 2005 build year is earlier than 10% of Hall's recorded-year cohort (271 bridges).

LOCUST ST/FAS 2235 in Hall, Nebraska is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2005, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 8. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure NE:U104504120R

POST-2000 · PRESTRESS · LONG-SPAN-RUN · TIED-CTRL · ARTERIAL-ADT · HEAVY-LOAD · CAT-GOOD

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • LONG-SPAN-RUN 4 spans
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • HEAVY-LOAD Heavy load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: LOCUST ST/FAS 2235

The LOCUST ST/FAS 2235 bridge in Hall, Nebraska carries LOCUST ST/FAS 2235 over M CH PLATTE RIVER. It was built in 2005, making it 21 years old today. The structure is built primarily of prestressed concrete continuous and spans 4 sections, stretching 74.4 meters (244 feet) end to end. Daily traffic averages 2,548 vehicles, placing it in the moderately-trafficked tier of Nebraska bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. All reported major components score above the Poor range.

How LOCUST ST/FAS 2235 compares

▲ 26.6
Load rating vs Nebraska average (27.4 t; 15,392 of 15,398 rated)
271
Bridges in Hall · 10 in Poor condition

Age against the county: built in 2005, earlier than 27 of Hall's 271 bridges with a recorded construction year (10%), against a county median build year of 1984. This is one of the newer structures in its county.

LOCUST ST/FAS 2235 54.0 t
Nebraska average (15,392 of 15,398 rated) 27.4 t

Live comparison across Nebraska bridges with a recorded inventory load rating (15,392 of 15,398 rated).

LOCUST ST/FAS 2235 vs every rated Nebraska bridge

Inventory load rating (metric tons), FHWA NBI, this state

54 Top 3% higher than 97% of 15,392 bridges

rated Nebraska bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
54.0 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Hall inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 271 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2005
Material
Prestressed Concrete Continuous
Number of Spans
4
Structure Length
74.4 m (244 ft)
Deck Width
12.4 m (41 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
2,548 vehicles/day
Structure Number
U104504120R

Condition Analysis

  • The deck (driving surface) is in good condition (8/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether LOCUST ST/FAS 2235 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare LOCUST ST/FAS 2235 against other structures in Hall and across Nebraska. Nebraska bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for LOCUST ST/FAS 2235?

LOCUST ST/FAS 2235 in Hall, Nebraska has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is LOCUST ST/FAS 2235 inspected?

LOCUST ST/FAS 2235's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,548 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. LOCUST ST/FAS 2235 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for LOCUST ST/FAS 2235?

LOCUST ST/FAS 2235 has an NBI inventory load rating of 54.0 metric tons.

Who is responsible for maintaining LOCUST ST/FAS 2235?

LOCUST ST/FAS 2235 is owned and maintained by City/Municipal Highway Agency.

How old is LOCUST ST/FAS 2235 and does age affect safety?

LOCUST ST/FAS 2235 was built in 2005, making it 21 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.