FHWA NBI 2024 Inspection record Public-domain dataset

BREAKFAST HILL RD

Carrying BREAKFAST HILL RD over I-95

1.1 MI NORTH HAMPTON TL, Rockingham, New Hampshire

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
25 t Inventory load rating Lower than 81% of rated New Hampshire bridges

BREAKFAST HILL RD in Rockingham, New Hampshire sits above 19% of rated New Hampshire bridges on inventory load rating (25 t), while its 1972 build year is earlier than 57% of Rockingham's recorded-year cohort (308 bridges).

BREAKFAST HILL RD in Rockingham, New Hampshire is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1972, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure NH:010201280007800

INTERSTATE-ERA · STEEL · MULTI-SPAN · DECK-LED · ARTERIAL-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • MULTI-SPAN 2 spans
  • DECK-LED Deck-led
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: BREAKFAST HILL RD

The BREAKFAST HILL RD bridge in Rockingham, New Hampshire carries BREAKFAST HILL RD over I-95. It was built in 1972, making it 54 years old today. It was last reconstructed in 2012, extending its service life. The structure is built primarily of steel continuous and spans 2 sections, stretching 77.1 meters (253 feet) end to end. Daily traffic averages 3,003 vehicles, placing it in the moderately-trafficked tier of New Hampshire bridges. It is owned and maintained by State Toll Authority.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How BREAKFAST HILL RD compares

▼ 13.7
Load rating vs New Hampshire average (38.4 t; 2,540 of 2,542 rated)
308
Bridges in Rockingham · 20 in Poor condition

Age against the county: built in 1972, earlier than 177 of Rockingham's 308 bridges with a recorded construction year (57%), against a county median build year of 1981. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

BREAKFAST HILL RD 24.7 t
New Hampshire average (2,540 of 2,542 rated) 38.4 t

Live comparison across New Hampshire bridges with a recorded inventory load rating (2,540 of 2,542 rated).

BREAKFAST HILL RD vs every rated New Hampshire bridge

Inventory load rating (metric tons), FHWA NBI, this state

25 Top 81% higher than 19% of 2,540 bridges

rated New Hampshire bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
24.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Rockingham inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 308 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1972
Last Reconstructed
2012
Material
Steel Continuous
Number of Spans
2
Structure Length
77.1 m (253 ft)
Deck Width
15.7 m (52 ft)
Owner
State Toll Authority
Avg Daily Traffic
3,003 vehicles/day
Structure Number
010201280007800

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether BREAKFAST HILL RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BREAKFAST HILL RD against other structures in Rockingham and across New Hampshire. New Hampshire bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BREAKFAST HILL RD?

BREAKFAST HILL RD in Rockingham, New Hampshire has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is BREAKFAST HILL RD inspected?

BREAKFAST HILL RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,003 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BREAKFAST HILL RD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BREAKFAST HILL RD?

BREAKFAST HILL RD has an NBI inventory load rating of 24.7 metric tons.

Who is responsible for maintaining BREAKFAST HILL RD?

BREAKFAST HILL RD is owned and maintained by State Toll Authority.

How old is BREAKFAST HILL RD and does age affect safety?

BREAKFAST HILL RD was built in 1972, making it 54 years old and last reconstructed in 2012.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.