FHWA NBI 2024 Inspection record Public-domain dataset

US 3 FEE TPK NB

Carrying US 3 FEE TPK NB over NASHUA RIVER

0.3 MI FROM NH 130, Hillsborough, New Hampshire

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
43 t Inventory load rating Higher than 64% of rated New Hampshire bridges

US 3 FEE TPK NB in Hillsborough, New Hampshire is rated Fair in the FHWA's 2024 National Bridge Inventory.

Built in 1955, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure NH:017701010011800

INTERSTATE-ERA · STEEL · LONG-SPAN-RUN · SUB-LED · HEAVY-ADT · HEAVY-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • LONG-SPAN-RUN 4 spans
  • SUB-LED Substructure-led
  • HEAVY-ADT Heavy ADT
  • HEAVY-LOAD Heavy load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: US 3 FEE TPK NB

The US 3 FEE TPK NB bridge in Hillsborough, New Hampshire carries US 3 FEE TPK NB over NASHUA RIVER. It was built in 1955, making it 71 years old today. It was last reconstructed in 1996, extending its service life. The structure is built primarily of steel continuous and spans 4 sections, stretching 103.0 meters (338 feet) end to end. Daily traffic averages 71,603 vehicles, placing it in the heavily-trafficked tier of New Hampshire bridges. It is owned and maintained by State Toll Authority.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How US 3 FEE TPK NB compares

▲ 4.4
Load rating vs New Hampshire average (38.4 t; 2,540 of 2,542 rated)
385
Bridges in Hillsborough · 34 in Poor condition

Age against the county: built in 1955, earlier than 273 of Hillsborough's 385 bridges with a recorded construction year (71%), against a county median build year of 1973. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

US 3 FEE TPK NB 42.8 t
New Hampshire average (2,540 of 2,542 rated) 38.4 t

Live comparison across New Hampshire bridges with a recorded inventory load rating (2,540 of 2,542 rated).

US 3 FEE TPK NB vs every rated New Hampshire bridge

Inventory load rating (metric tons), FHWA NBI, this state

43 Top 36% higher than 64% of 2,540 bridges

rated New Hampshire bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
42.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Hillsborough inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 385 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1955
Last Reconstructed
1996
Material
Steel Continuous
Number of Spans
4
Structure Length
103.0 m (338 ft)
Deck Width
30.5 m (100 ft)
Owner
State Toll Authority
Avg Daily Traffic
71,603 vehicles/day
Structure Number
017701010011800

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether US 3 FEE TPK NB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare US 3 FEE TPK NB against other structures in Hillsborough and across New Hampshire. New Hampshire bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for US 3 FEE TPK NB?

US 3 FEE TPK NB in Hillsborough, New Hampshire has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is US 3 FEE TPK NB inspected?

US 3 FEE TPK NB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 71,603 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. US 3 FEE TPK NB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for US 3 FEE TPK NB?

US 3 FEE TPK NB has an NBI inventory load rating of 42.8 metric tons.

Who is responsible for maintaining US 3 FEE TPK NB?

US 3 FEE TPK NB is owned and maintained by State Toll Authority.

How old is US 3 FEE TPK NB and does age affect safety?

US 3 FEE TPK NB was built in 1955, making it 71 years old and last reconstructed in 1996.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.