FHWA NBI 2024 Inspection record Public-domain dataset

I-93 REST EXIT

Carrying I-93 REST EXIT over POLICY BROOK

REST AREA EXIT ROAD, Rockingham, New Hampshire

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
90 t Inventory load rating Higher than 97% of rated New Hampshire bridges

I-93 REST EXIT in Rockingham, New Hampshire sits above 97% of rated New Hampshire bridges on inventory load rating (90 t), while its 1967 build year is earlier than 67% of Rockingham's recorded-year cohort (308 bridges).

I-93 REST EXIT in Rockingham, New Hampshire is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 1967, it carries 1 rated component on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure NH:022800950005200

INTERSTATE-ERA · STEEL · MULTI-SPAN · CULVERT-LED · ARTERIAL-ADT · HEAVY-LOAD · CAT-GOOD

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • MULTI-SPAN 2 spans
  • CULVERT-LED Culvert-led
  • ARTERIAL-ADT Arterial ADT
  • HEAVY-LOAD Heavy load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: I-93 REST EXIT

The I-93 REST EXIT bridge in Rockingham, New Hampshire carries I-93 REST EXIT over POLICY BROOK. It was built in 1967, making it 59 years old today. It was last reconstructed in 2022, extending its service life. The structure is built primarily of steel and spans 2 sections, stretching 8.1 meters (27 feet) end to end. Daily traffic averages 1,800 vehicles, placing it in the moderately-trafficked tier of New Hampshire bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show culvert at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range.

How I-93 REST EXIT compares

▲ 51.4
Load rating vs New Hampshire average (38.4 t; 2,540 of 2,542 rated)
308
Bridges in Rockingham · 20 in Poor condition

Age against the county: built in 1967, earlier than 205 of Rockingham's 308 bridges with a recorded construction year (67%), against a county median build year of 1981. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

I-93 REST EXIT 89.8 t
New Hampshire average (2,540 of 2,542 rated) 38.4 t

Live comparison across New Hampshire bridges with a recorded inventory load rating (2,540 of 2,542 rated).

I-93 REST EXIT vs every rated New Hampshire bridge

Inventory load rating (metric tons), FHWA NBI, this state

90 Top 3% higher than 97% of 2,540 bridges

rated New Hampshire bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Culvert
7/9
Good (7–9)
Inventory Load Rating
89.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Rockingham inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 308 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1967
Last Reconstructed
2022
Material
Steel
Number of Spans
2
Structure Length
8.1 m (27 ft)
0
Owner
State Highway Agency
Avg Daily Traffic
1,800 vehicles/day
Structure Number
022800950005200

How to read this record

This page shows what the last federal inspection recorded, not whether I-93 REST EXIT is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare I-93 REST EXIT against other structures in Rockingham and across New Hampshire. New Hampshire bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I-93 REST EXIT?

I-93 REST EXIT in Rockingham, New Hampshire on the FHWA's 0–9 scale.

How often is I-93 REST EXIT inspected?

I-93 REST EXIT's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,800 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I-93 REST EXIT is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I-93 REST EXIT?

I-93 REST EXIT has an NBI inventory load rating of 89.8 metric tons.

Who is responsible for maintaining I-93 REST EXIT?

I-93 REST EXIT is owned and maintained by State Highway Agency.

How old is I-93 REST EXIT and does age affect safety?

I-93 REST EXIT was built in 1967, making it 59 years old and last reconstructed in 2022.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.