FHWA NBI 2024 Inspection record Public-domain dataset

HELLER PARKWAY

Carrying HELLER PARKWAY over CITY SUBWAY

2.1 MI NE I-280&NJ21 JCT, Essex, New Jersey

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
27 t Inventory load rating Lower than 83% of rated New Jersey bridges

HELLER PARKWAY in Essex, New Jersey sits above 17% of rated New Jersey bridges on inventory load rating (27 t), while its 1900 build year is earlier than 99% of Essex's recorded-year cohort (505 bridges).

HELLER PARKWAY in Essex, New Jersey is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1900, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure NJ:0700N01

PRE-1950 · PRESTRESS · SINGLE-SPAN · TIED-CTRL · HEAVY-ADT · STANDARD-LOAD · CAT-FAIR

  • PRE-1950 Pre-1950
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: HELLER PARKWAY

The HELLER PARKWAY bridge in Essex, New Jersey carries HELLER PARKWAY over CITY SUBWAY. It was built in 1900, making it 126 years old today. It was last reconstructed in 1985, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 15.8 meters (52 feet) end to end. Daily traffic averages 16,860 vehicles, placing it in the heavily-trafficked tier of New Jersey bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How HELLER PARKWAY compares

▼ 16.3
Load rating vs New Jersey average (43.5 t; 6,826 of 6,827 rated)
505
Bridges in Essex · 14 in Poor condition

Age against the county: built in 1900, earlier than 498 of Essex's 505 bridges with a recorded construction year (99%), against a county median build year of 1967. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

HELLER PARKWAY 27.2 t
New Jersey average (6,826 of 6,827 rated) 43.5 t

Live comparison across New Jersey bridges with a recorded inventory load rating (6,826 of 6,827 rated).

HELLER PARKWAY vs every rated New Jersey bridge

Inventory load rating (metric tons), FHWA NBI, this state

27 Top 83% higher than 17% of 6,826 bridges

rated New Jersey bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
27.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Essex inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 505 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1900
Last Reconstructed
1985
Material
Prestressed Concrete
Number of Spans
1
Structure Length
15.8 m (52 ft)
Deck Width
21.4 m (70 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
16,860 vehicles/day
Structure Number
0700N01

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether HELLER PARKWAY is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare HELLER PARKWAY against other structures in Essex and across New Jersey. New Jersey bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HELLER PARKWAY?

HELLER PARKWAY in Essex, New Jersey has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is HELLER PARKWAY inspected?

HELLER PARKWAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 16,860 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HELLER PARKWAY is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HELLER PARKWAY?

HELLER PARKWAY has an NBI inventory load rating of 27.2 metric tons.

Who is responsible for maintaining HELLER PARKWAY?

HELLER PARKWAY is owned and maintained by City/Municipal Highway Agency.

How old is HELLER PARKWAY and does age affect safety?

HELLER PARKWAY was built in 1900, making it 126 years old and last reconstructed in 1985.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.