FHWA NBI 2024 Inspection record Public-domain dataset

PARKWAY DRIVE

Carrying PARKWAY DRIVE over HATFIELD CREEK

0.3 MI EAST OF CR 621, Morris, New Jersey

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
23 t Inventory load rating Lower than 90% of rated New Jersey bridges

PARKWAY DRIVE in Morris, New Jersey sits above 10% of rated New Jersey bridges on inventory load rating (23 t), while its 1970 build year is earlier than 39% of Morris's recorded-year cohort (508 bridges).

PARKWAY DRIVE in Morris, New Jersey is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1970, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure NJ:1400230

INTERSTATE-ERA · PRESTRESS · SINGLE-SPAN · TIED-CTRL · LOCAL-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: PARKWAY DRIVE

The PARKWAY DRIVE bridge in Morris, New Jersey carries PARKWAY DRIVE over HATFIELD CREEK. It was built in 1970, making it 56 years old today. It was last reconstructed in 1994, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 13.4 meters (44 feet) end to end. Daily traffic averages 155 vehicles, placing it in the lower-traffic tier of New Jersey bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How PARKWAY DRIVE compares

▼ 20.8
Load rating vs New Jersey average (43.5 t; 6,826 of 6,827 rated)
508
Bridges in Morris · 30 in Poor condition

Age against the county: built in 1970, earlier than 200 of Morris's 508 bridges with a recorded construction year (39%), against a county median build year of 1966. This is one of the newer structures in its county.

PARKWAY DRIVE 22.7 t
New Jersey average (6,826 of 6,827 rated) 43.5 t

Live comparison across New Jersey bridges with a recorded inventory load rating (6,826 of 6,827 rated).

PARKWAY DRIVE vs every rated New Jersey bridge

Inventory load rating (metric tons), FHWA NBI, this state

23 Top 90% higher than 10% of 6,826 bridges

rated New Jersey bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
22.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Morris inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 508 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1970
Last Reconstructed
1994
Material
Prestressed Concrete
Number of Spans
1
Structure Length
13.4 m (44 ft)
Deck Width
11.0 m (36 ft)
Owner
County Highway Agency
Avg Daily Traffic
155 vehicles/day
Structure Number
1400230

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether PARKWAY DRIVE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PARKWAY DRIVE against other structures in Morris and across New Jersey. New Jersey bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PARKWAY DRIVE?

PARKWAY DRIVE in Morris, New Jersey has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PARKWAY DRIVE inspected?

PARKWAY DRIVE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 155 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PARKWAY DRIVE is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PARKWAY DRIVE?

PARKWAY DRIVE has an NBI inventory load rating of 22.7 metric tons.

Who is responsible for maintaining PARKWAY DRIVE?

PARKWAY DRIVE is owned and maintained by County Highway Agency.

How old is PARKWAY DRIVE and does age affect safety?

PARKWAY DRIVE was built in 1970, making it 56 years old and last reconstructed in 1994.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.