FHWA NBI 2024 Inspection record Public-domain dataset

I-287 NORTHBOUND

Carrying I-287 NORTHBOUND over US 202-206

AT I-287 EXIT 22, Somerset, New Jersey

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
55 t Inventory load rating Higher than 77% of rated New Jersey bridges

I-287 NORTHBOUND in Somerset, New Jersey sits above 77% of rated New Jersey bridges on inventory load rating (55 t), while its 1965 build year is earlier than 53% of Somerset's recorded-year cohort (397 bridges).

I-287 NORTHBOUND in Somerset, New Jersey is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1965, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure NJ:1815154

INTERSTATE-ERA · STEEL · MULTI-SPAN · SUPER-LED · HEAVY-ADT · HEAVY-LOAD · CAT-POOR

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • MULTI-SPAN 3 spans
  • SUPER-LED Superstructure-led
  • HEAVY-ADT Heavy ADT
  • HEAVY-LOAD Heavy load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: I-287 NORTHBOUND

The I-287 NORTHBOUND bridge in Somerset, New Jersey carries I-287 NORTHBOUND over US 202-206. It was built in 1965, making it 61 years old today. It was last reconstructed in 1996, extending its service life. The structure is built primarily of steel and spans 3 sections, stretching 50.6 meters (166 feet) end to end. Daily traffic averages 40,484 vehicles, placing it in the heavily-trafficked tier of New Jersey bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 6/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order.

How I-287 NORTHBOUND compares

▲ 11.8
Load rating vs New Jersey average (43.5 t; 6,826 of 6,827 rated)
397
Bridges in Somerset · 38 in Poor condition

Age against the county: built in 1965, earlier than 212 of Somerset's 397 bridges with a recorded construction year (53%), against a county median build year of 1968. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

I-287 NORTHBOUND 55.3 t
New Jersey average (6,826 of 6,827 rated) 43.5 t

Live comparison across New Jersey bridges with a recorded inventory load rating (6,826 of 6,827 rated).

I-287 NORTHBOUND vs every rated New Jersey bridge

Inventory load rating (metric tons), FHWA NBI, this state

55 Top 23% higher than 77% of 6,826 bridges

rated New Jersey bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
55.3 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Somerset inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 397 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1965
Last Reconstructed
1996
Material
Steel
Number of Spans
3
Structure Length
50.6 m (166 ft)
Deck Width
21.5 m (71 ft)
Owner
State Highway Agency
Avg Daily Traffic
40,484 vehicles/day
Structure Number
1815154

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration on the inspecting agency's 0-9 scale.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

I-287 NORTHBOUND is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare I-287 NORTHBOUND against other structures in Somerset and across New Jersey. New Jersey bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I-287 NORTHBOUND?

I-287 NORTHBOUND in Somerset, New Jersey has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is I-287 NORTHBOUND inspected?

I-287 NORTHBOUND's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 40,484 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I-287 NORTHBOUND is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I-287 NORTHBOUND?

I-287 NORTHBOUND has an NBI inventory load rating of 55.3 metric tons.

Who is responsible for maintaining I-287 NORTHBOUND?

I-287 NORTHBOUND is owned and maintained by State Highway Agency.

How old is I-287 NORTHBOUND and does age affect safety?

I-287 NORTHBOUND was built in 1965, making it 61 years old and last reconstructed in 1996.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.