FHWA NBI 2024 Inspection record Public-domain dataset

RAMPART BL

Carrying RAMPART BL over CHEYENNE CHNL

LAS VEGAS, Clark, Nevada

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
41 t Inventory load rating Lower than 53% of rated Nevada bridges

RAMPART BL in Clark, Nevada sits above 47% of rated Nevada bridges on inventory load rating (41 t), while its 1996 build year is earlier than 57% of Clark's recorded-year cohort (1,141 bridges).

RAMPART BL in Clark, Nevada is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1996, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure NV:B2144

LATE-CENTURY · CONCRETE · SINGLE-SPAN · TIED-CTRL · HEAVY-ADT · HEAVY-LOAD · CAT-FAIR

  • LATE-CENTURY 1980–1999
  • CONCRETE Concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • HEAVY-LOAD Heavy load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: RAMPART BL

The RAMPART BL bridge in Clark, Nevada carries RAMPART BL over CHEYENNE CHNL. It was built in 1996, making it 30 years old today. The structure is built primarily of concrete and spans 1 section, stretching 11.1 meters (36 feet) end to end. Daily traffic averages 21,100 vehicles, placing it in the heavily-trafficked tier of Nevada bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How RAMPART BL compares

▼ 6.7
Load rating vs Nevada average (47.2 t; 2,090 of 2,099 rated)
1,141
Bridges in Clark · 2 in Poor condition

Age against the county: built in 1996, earlier than 647 of Clark's 1,141 bridges with a recorded construction year (57%), against a county median build year of 1998. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

RAMPART BL 40.5 t
Nevada average (2,090 of 2,099 rated) 47.2 t

Live comparison across Nevada bridges with a recorded inventory load rating (2,090 of 2,099 rated).

RAMPART BL vs every rated Nevada bridge

Inventory load rating (metric tons), FHWA NBI, this state

41 Top 53% higher than 47% of 2,090 bridges

rated Nevada bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
40.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Clark inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 1,141 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1996
Material
Concrete
Number of Spans
1
Structure Length
11.1 m (36 ft)
Deck Width
34.4 m (113 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
21,100 vehicles/day
Structure Number
B2144

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether RAMPART BL is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RAMPART BL against other structures in Clark and across Nevada. Nevada bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RAMPART BL?

RAMPART BL in Clark, Nevada has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is RAMPART BL inspected?

RAMPART BL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 21,100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RAMPART BL is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RAMPART BL?

RAMPART BL has an NBI inventory load rating of 40.5 metric tons.

Who is responsible for maintaining RAMPART BL?

RAMPART BL is owned and maintained by City/Municipal Highway Agency.

How old is RAMPART BL and does age affect safety?

RAMPART BL was built in 1996, making it 30 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.