FHWA NBI 2024 Inspection record Public-domain dataset

RMP EB SMRLN-US95N

Carrying RMP EB SMRLN-US95N over US95

LAS VEGAS, Clark, Nevada

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
59 t Inventory load rating Higher than 78% of rated Nevada bridges

RMP EB SMRLN-US95N in Clark, Nevada sits above 78% of rated Nevada bridges on inventory load rating (59 t), while its 2006 build year is earlier than 28% of Clark's recorded-year cohort (1,141 bridges).

RMP EB SMRLN-US95N in Clark, Nevada is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2006, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure NV:I1210R

POST-2000 · PRESTRESS · MULTI-SPAN · SUB-LED · HEAVY-ADT · HEAVY-LOAD · CAT-GOOD

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • MULTI-SPAN 3 spans
  • SUB-LED Substructure-led
  • HEAVY-ADT Heavy ADT
  • HEAVY-LOAD Heavy load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: RMP EB SMRLN-US95N

The RMP EB SMRLN-US95N bridge in Clark, Nevada carries RMP EB SMRLN-US95N over US95. It was built in 2006, making it 20 years old today. The structure is built primarily of prestressed concrete continuous and spans 3 sections, stretching 128.2 meters (421 feet) end to end. Daily traffic averages 38,000 vehicles, placing it in the heavily-trafficked tier of Nevada bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How RMP EB SMRLN-US95N compares

▲ 12.2
Load rating vs Nevada average (47.2 t; 2,090 of 2,099 rated)
1,141
Bridges in Clark · 2 in Poor condition

Age against the county: built in 2006, earlier than 316 of Clark's 1,141 bridges with a recorded construction year (28%), against a county median build year of 1998. This is one of the newer structures in its county.

RMP EB SMRLN-US95N 59.4 t
Nevada average (2,090 of 2,099 rated) 47.2 t

Live comparison across Nevada bridges with a recorded inventory load rating (2,090 of 2,099 rated).

RMP EB SMRLN-US95N vs every rated Nevada bridge

Inventory load rating (metric tons), FHWA NBI, this state

59 Top 22% higher than 78% of 2,090 bridges

rated Nevada bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
59.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Clark inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 1,141 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2006
Material
Prestressed Concrete Continuous
Number of Spans
3
Structure Length
128.2 m (421 ft)
Deck Width
9.3 m (31 ft)
Owner
State Highway Agency
Avg Daily Traffic
38,000 vehicles/day
Structure Number
I1210R

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether RMP EB SMRLN-US95N is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RMP EB SMRLN-US95N against other structures in Clark and across Nevada. Nevada bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RMP EB SMRLN-US95N?

RMP EB SMRLN-US95N in Clark, Nevada has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is RMP EB SMRLN-US95N inspected?

RMP EB SMRLN-US95N's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 38,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RMP EB SMRLN-US95N is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RMP EB SMRLN-US95N?

RMP EB SMRLN-US95N has an NBI inventory load rating of 59.4 metric tons.

Who is responsible for maintaining RMP EB SMRLN-US95N?

RMP EB SMRLN-US95N is owned and maintained by State Highway Agency.

How old is RMP EB SMRLN-US95N and does age affect safety?

RMP EB SMRLN-US95N was built in 2006, making it 20 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.