FHWA NBI 2024 Inspection record Public-domain dataset

WESTCHESTER AVE

Carrying WESTCHESTER AVE over RTE 907H RTE 907H NYC

.5 MI S I95 & BX RIVER PK, Bronx, New York

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
37 t Inventory load rating Lower than 59% of rated New York bridges

WESTCHESTER AVE in Bronx, New York sits above 41% of rated New York bridges on inventory load rating (37 t), while its 1948 build year is earlier than 58% of Bronx's recorded-year cohort (311 bridges).

WESTCHESTER AVE in Bronx, New York is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1948, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure NY:000000001067077

PRE-1950 · CONCRETE · MULTI-SPAN · TIED-CTRL · HEAVY-ADT · STANDARD-LOAD · CAT-FAIR

  • PRE-1950 Pre-1950
  • CONCRETE Concrete
  • MULTI-SPAN 2 spans
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: WESTCHESTER AVE

The WESTCHESTER AVE bridge in Bronx, New York carries WESTCHESTER AVE over RTE 907H RTE 907H NYC. It was built in 1948, making it 78 years old today. The structure is built primarily of concrete continuous and spans 2 sections, stretching 27.1 meters (89 feet) end to end. Daily traffic averages 10,825 vehicles, placing it in the heavily-trafficked tier of New York bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How WESTCHESTER AVE compares

▼ 4.5
Load rating vs New York average (41.7 t; 17,641 of 17,642 rated)
311
Bridges in Bronx · 26 in Poor condition

Age against the county: built in 1948, earlier than 181 of Bronx's 311 bridges with a recorded construction year (58%), against a county median build year of 1951. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

WESTCHESTER AVE 37.2 t
New York average (17,641 of 17,642 rated) 41.7 t

Live comparison across New York bridges with a recorded inventory load rating (17,641 of 17,642 rated).

WESTCHESTER AVE vs every rated New York bridge

Inventory load rating (metric tons), FHWA NBI, this state

37 Top 59% higher than 41% of 17,641 bridges

rated New York bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
37.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Bronx inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 311 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1948
Material
Concrete Continuous
Number of Spans
2
Structure Length
27.1 m (89 ft)
Deck Width
30.5 m (100 ft)
Owner
State Highway Agency
Avg Daily Traffic
10,825 vehicles/day
Structure Number
000000001067077

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether WESTCHESTER AVE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare WESTCHESTER AVE against other structures in Bronx and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for WESTCHESTER AVE?

WESTCHESTER AVE in Bronx, New York has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is WESTCHESTER AVE inspected?

WESTCHESTER AVE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10,825 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. WESTCHESTER AVE is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for WESTCHESTER AVE?

WESTCHESTER AVE has an NBI inventory load rating of 37.2 metric tons.

Who is responsible for maintaining WESTCHESTER AVE?

WESTCHESTER AVE is owned and maintained by State Highway Agency.

How old is WESTCHESTER AVE and does age affect safety?

WESTCHESTER AVE was built in 1948, making it 78 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.