FHWA NBI 2024 Inspection record Public-domain dataset

BLOOMER ROAD

Carrying BLOOMER ROAD over GOOSEBERRY CREEK

1.3 MI SE of RTE 214 and, Greene, New York

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
79 t Inventory load rating Higher than 97% of rated New York bridges

BLOOMER ROAD in Greene, New York sits above 97% of rated New York bridges on inventory load rating (79 t), while its 2023 build year is earlier than 0% of Greene's recorded-year cohort (227 bridges).

BLOOMER ROAD in Greene, New York is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2023, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 9. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure NY:000000003200960

POST-2000 · PRESTRESS · SINGLE-SPAN · TIED-CTRL · LOCAL-ADT · HEAVY-LOAD · CAT-GOOD

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • HEAVY-LOAD Heavy load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: BLOOMER ROAD

The BLOOMER ROAD bridge in Greene, New York carries BLOOMER ROAD over GOOSEBERRY CREEK. It was built in 2023, making it 3 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 27.3 meters (90 feet) end to end. Daily traffic averages 418 vehicles, placing it in the lower-traffic tier of New York bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 9/9, superstructure at 9/9, substructure at 9/9. The weakest component sits in good condition. All reported major components score above the Poor range.

How BLOOMER ROAD compares

▲ 37.2
Load rating vs New York average (41.7 t; 17,641 of 17,642 rated)
227
Bridges in Greene · 22 in Poor condition

Age against the county: built in 2023, earlier than 0 of Greene's 227 bridges with a recorded construction year (0%), against a county median build year of 1984. This is one of the newer structures in its county.

BLOOMER ROAD 78.9 t
New York average (17,641 of 17,642 rated) 41.7 t

Live comparison across New York bridges with a recorded inventory load rating (17,641 of 17,642 rated).

BLOOMER ROAD vs every rated New York bridge

Inventory load rating (metric tons), FHWA NBI, this state

79 Top 3% higher than 97% of 17,641 bridges

rated New York bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
9/9
Good (7–9)
Superstructure
9/9
Good (7–9)
Substructure
9/9
Good (7–9)
Inventory Load Rating
78.9 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Greene inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 227 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2023
Material
Prestressed Concrete
Number of Spans
1
Structure Length
27.3 m (90 ft)
Deck Width
10.2 m (33 ft)
Owner
County Highway Agency
Avg Daily Traffic
418 vehicles/day
Structure Number
000000003200960

Condition Analysis

  • The deck (driving surface) rates good at 9/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (9/9), showing no significant deterioration.
  • At 9/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether BLOOMER ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BLOOMER ROAD against other structures in Greene and across New York. New York bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BLOOMER ROAD?

BLOOMER ROAD in Greene, New York has a deck rating of 9/9, superstructure rating of 9/9, and substructure rating of 9/9 on the FHWA's 0–9 scale.

How often is BLOOMER ROAD inspected?

BLOOMER ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 418 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BLOOMER ROAD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BLOOMER ROAD?

BLOOMER ROAD has an NBI inventory load rating of 78.9 metric tons.

Who is responsible for maintaining BLOOMER ROAD?

BLOOMER ROAD is owned and maintained by County Highway Agency.

How old is BLOOMER ROAD and does age affect safety?

BLOOMER ROAD was built in 2023, making it 3 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.