FHWA NBI 2024 Inspection record Public-domain dataset

BIG CREEK PARKWAY

Carrying BIG CREEK PARKWAY over I80 OHIO TPK

8.8MI EAST OF EXIT 9, Cuyahoga, Ohio

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
26 t Inventory load rating Lower than 88% of rated Ohio bridges

BIG CREEK PARKWAY in Cuyahoga, Ohio sits above 12% of rated Ohio bridges on inventory load rating (26 t), while its 1954 build year is earlier than 76% of Cuyahoga's recorded-year cohort (871 bridges).

BIG CREEK PARKWAY in Cuyahoga, Ohio is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1954, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OH:1829491

INTERSTATE-ERA · STEEL · MULTI-SPAN · SUB-LED · HEAVY-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • MULTI-SPAN 2 spans
  • SUB-LED Substructure-led
  • HEAVY-ADT Heavy ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: BIG CREEK PARKWAY

The BIG CREEK PARKWAY bridge in Cuyahoga, Ohio carries BIG CREEK PARKWAY over I80 OHIO TPK. It was built in 1954, making it 72 years old today. It was last reconstructed in 1990, extending its service life. The structure is built primarily of steel continuous and spans 2 sections, stretching 69.8 meters (229 feet) end to end. Daily traffic averages 26,000 vehicles, placing it in the heavily-trafficked tier of Ohio bridges. It is owned and maintained by State Toll Authority.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How BIG CREEK PARKWAY compares

▼ 11.2
Load rating vs Ohio average (37.1 t; 26,729 rated)
871
Bridges in Cuyahoga · 84 in Poor condition

Age against the county: built in 1954, earlier than 666 of Cuyahoga's 871 bridges with a recorded construction year (76%), against a county median build year of 1969. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

BIG CREEK PARKWAY 25.9 t
Ohio average (26,729 rated) 37.1 t

Live comparison across Ohio bridges with a recorded inventory load rating (26,729 rated).

BIG CREEK PARKWAY vs every rated Ohio bridge

Inventory load rating (metric tons), FHWA NBI, this state

26 Top 88% higher than 12% of 26,729 bridges

rated Ohio bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
25.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Cuyahoga inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 871 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1954
Last Reconstructed
1990
Material
Steel Continuous
Number of Spans
2
Structure Length
69.8 m (229 ft)
Deck Width
15.5 m (51 ft)
Owner
State Toll Authority
Avg Daily Traffic
26,000 vehicles/day
Structure Number
1829491

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether BIG CREEK PARKWAY is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BIG CREEK PARKWAY against other structures in Cuyahoga and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BIG CREEK PARKWAY?

BIG CREEK PARKWAY in Cuyahoga, Ohio has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is BIG CREEK PARKWAY inspected?

BIG CREEK PARKWAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 26,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BIG CREEK PARKWAY is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BIG CREEK PARKWAY?

BIG CREEK PARKWAY has an NBI inventory load rating of 25.9 metric tons.

Who is responsible for maintaining BIG CREEK PARKWAY?

BIG CREEK PARKWAY is owned and maintained by State Toll Authority.

How old is BIG CREEK PARKWAY and does age affect safety?

BIG CREEK PARKWAY was built in 1954, making it 72 years old and last reconstructed in 1990.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.