FHWA NBI 2024 Inspection record Public-domain dataset

I-670

Carrying I-670 over OVER STELZER RD.

0.75 MI E OF IR270, Franklin, Ohio

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
40 t Inventory load rating Higher than 68% of rated Ohio bridges

I-670 in Franklin, Ohio sits above 68% of rated Ohio bridges on inventory load rating (40 t), while its 1972 build year is earlier than 58% of Franklin's recorded-year cohort (922 bridges).

I-670 in Franklin, Ohio is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1972, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OH:2518112

INTERSTATE-ERA · STEEL · LONG-SPAN-RUN · SUPER-LED · HEAVY-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • LONG-SPAN-RUN 4 spans
  • SUPER-LED Superstructure-led
  • HEAVY-ADT Heavy ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: I-670

The I-670 bridge in Franklin, Ohio carries I-670 over OVER STELZER RD.. It was built in 1972, making it 54 years old today. It was last reconstructed in 1992, extending its service life. The structure is built primarily of steel continuous and spans 4 sections, stretching 59.7 meters (196 feet) end to end. Daily traffic averages 112,311 vehicles, placing it in the heavily-trafficked tier of Ohio bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How I-670 compares

▲ 2.8
Load rating vs Ohio average (37.1 t; 26,729 rated)
922
Bridges in Franklin · 18 in Poor condition

Age against the county: built in 1972, earlier than 534 of Franklin's 922 bridges with a recorded construction year (58%), against a county median build year of 1978. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

I-670 39.9 t
Ohio average (26,729 rated) 37.1 t

Live comparison across Ohio bridges with a recorded inventory load rating (26,729 rated).

I-670 vs every rated Ohio bridge

Inventory load rating (metric tons), FHWA NBI, this state

40 Top 32% higher than 68% of 26,729 bridges

rated Ohio bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
39.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Franklin inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 922 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1972
Last Reconstructed
1992
Material
Steel Continuous
Number of Spans
4
Structure Length
59.7 m (196 ft)
Deck Width
50.0 m (164 ft)
Owner
State Highway Agency
Avg Daily Traffic
112,311 vehicles/day
Structure Number
2518112

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether I-670 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare I-670 against other structures in Franklin and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I-670?

I-670 in Franklin, Ohio has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is I-670 inspected?

I-670's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 112,311 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I-670 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I-670?

I-670 has an NBI inventory load rating of 39.9 metric tons.

Who is responsible for maintaining I-670?

I-670 is owned and maintained by State Highway Agency.

How old is I-670 and does age affect safety?

I-670 was built in 1972, making it 54 years old and last reconstructed in 1992.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.