FHWA NBI 2024 Inspection record Public-domain dataset

T-1 NORTH RIDGE

Carrying T-1 NORTH RIDGE over OVER LOR-002 -0825

.83 MILES EAST OF SR 58, Lorain, Ohio

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
52 t Inventory load rating Higher than 87% of rated Ohio bridges

T-1 NORTH RIDGE in Lorain, Ohio sits above 87% of rated Ohio bridges on inventory load rating (52 t), while its 1967 build year is earlier than 58% of Lorain's recorded-year cohort (366 bridges).

T-1 NORTH RIDGE in Lorain, Ohio is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1967, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OH:4700368

INTERSTATE-ERA · STEEL · LONG-SPAN-RUN · SUB-LED · ARTERIAL-ADT · HEAVY-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • LONG-SPAN-RUN 4 spans
  • SUB-LED Substructure-led
  • ARTERIAL-ADT Arterial ADT
  • HEAVY-LOAD Heavy load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: T-1 NORTH RIDGE

The T-1 NORTH RIDGE bridge in Lorain, Ohio carries T-1 NORTH RIDGE over OVER LOR-002 -0825. It was built in 1967, making it 59 years old today. It was last reconstructed in 1999, extending its service life. The structure is built primarily of steel continuous and spans 4 sections, stretching 69.8 meters (229 feet) end to end. Daily traffic averages 4,687 vehicles, placing it in the moderately-trafficked tier of Ohio bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How T-1 NORTH RIDGE compares

▲ 14.7
Load rating vs Ohio average (37.1 t; 26,729 rated)
366
Bridges in Lorain · 20 in Poor condition

Age against the county: built in 1967, earlier than 213 of Lorain's 366 bridges with a recorded construction year (58%), against a county median build year of 1973. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

T-1 NORTH RIDGE 51.8 t
Ohio average (26,729 rated) 37.1 t

Live comparison across Ohio bridges with a recorded inventory load rating (26,729 rated).

T-1 NORTH RIDGE vs every rated Ohio bridge

Inventory load rating (metric tons), FHWA NBI, this state

52 Top 13% higher than 87% of 26,729 bridges

rated Ohio bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
51.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Lorain inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 366 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1967
Last Reconstructed
1999
Material
Steel Continuous
Number of Spans
4
Structure Length
69.8 m (229 ft)
Deck Width
12.9 m (42 ft)
Owner
State Highway Agency
Avg Daily Traffic
4,687 vehicles/day
Structure Number
4700368

Condition Analysis

  • The deck (driving surface) rates good at 8/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether T-1 NORTH RIDGE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare T-1 NORTH RIDGE against other structures in Lorain and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for T-1 NORTH RIDGE?

T-1 NORTH RIDGE in Lorain, Ohio has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is T-1 NORTH RIDGE inspected?

T-1 NORTH RIDGE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,687 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. T-1 NORTH RIDGE is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for T-1 NORTH RIDGE?

T-1 NORTH RIDGE has an NBI inventory load rating of 51.8 metric tons.

Who is responsible for maintaining T-1 NORTH RIDGE?

T-1 NORTH RIDGE is owned and maintained by State Highway Agency.

How old is T-1 NORTH RIDGE and does age affect safety?

T-1 NORTH RIDGE was built in 1967, making it 59 years old and last reconstructed in 1999.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.