FHWA NBI 2024 Inspection record Public-domain dataset

Prov--Neap-Swan

Carrying Prov--Neap-Swan over HARRIS DITCH 0975

0. 5 MI. S. OF NEOWASH RD, Lucas, Ohio

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
75 t Inventory load rating Higher than 98% of rated Ohio bridges

Prov--Neap-Swan in Lucas, Ohio sits above 98% of rated Ohio bridges on inventory load rating (75 t), while its 2019 build year is earlier than 7% of Lucas's recorded-year cohort (418 bridges).

Prov--Neap-Swan in Lucas, Ohio is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2019, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 9. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OH:4830696

POST-2000 · PRESTRESS · SINGLE-SPAN · TIED-CTRL · ARTERIAL-ADT · HEAVY-LOAD · CAT-GOOD

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • HEAVY-LOAD Heavy load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: Prov--Neap-Swan

The Prov--Neap-Swan bridge in Lucas, Ohio carries Prov--Neap-Swan over HARRIS DITCH 0975. It was built in 2019, making it 7 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 9.4 meters (31 feet) end to end. Daily traffic averages 1,326 vehicles, placing it in the moderately-trafficked tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 9/9, superstructure at 9/9, substructure at 9/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range.

How Prov--Neap-Swan compares

▲ 37.4
Load rating vs Ohio average (37.1 t; 26,729 rated)
418
Bridges in Lucas · 8 in Poor condition

Age against the county: built in 2019, earlier than 28 of Lucas's 418 bridges with a recorded construction year (7%), against a county median build year of 1983. This is one of the newer structures in its county.

Prov--Neap-Swan 74.5 t
Ohio average (26,729 rated) 37.1 t

Live comparison across Ohio bridges with a recorded inventory load rating (26,729 rated).

Prov--Neap-Swan vs every rated Ohio bridge

Inventory load rating (metric tons), FHWA NBI, this state

75 Top 2% higher than 98% of 26,729 bridges

rated Ohio bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
9/9
Good (7–9)
Superstructure
9/9
Good (7–9)
Substructure
9/9
Good (7–9)
Inventory Load Rating
74.5 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Lucas inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 418 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2019
Material
Prestressed Concrete
Number of Spans
1
Structure Length
9.4 m (31 ft)
Deck Width
12.2 m (40 ft)
Owner
County Highway Agency
Avg Daily Traffic
1,326 vehicles/day
Structure Number
4830696

Condition Analysis

  • The deck (driving surface) is in good condition (9/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (9/9), showing no significant deterioration.
  • At 9/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether Prov--Neap-Swan is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare Prov--Neap-Swan against other structures in Lucas and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Prov--Neap-Swan?

Prov--Neap-Swan in Lucas, Ohio has a deck rating of 9/9, superstructure rating of 9/9, and substructure rating of 9/9 on the FHWA's 0–9 scale.

How often is Prov--Neap-Swan inspected?

Prov--Neap-Swan's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,326 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Prov--Neap-Swan is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Prov--Neap-Swan?

Prov--Neap-Swan has an NBI inventory load rating of 74.5 metric tons.

Who is responsible for maintaining Prov--Neap-Swan?

Prov--Neap-Swan is owned and maintained by County Highway Agency.

How old is Prov--Neap-Swan and does age affect safety?

Prov--Neap-Swan was built in 2019, making it 7 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.