FHWA NBI 2024 Inspection record Public-domain dataset

ALLEY BETWN 8&9 ST

Carrying ALLEY BETWN 8&9 ST over NUMU CREEK

.2N OF LEE & .2E OF 11 ST, Comanche, Oklahoma

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
9 t Inventory load rating Lower than 97% of rated Oklahoma bridges

ALLEY BETWN 8&9 ST in Comanche, Oklahoma sits above 3% of rated Oklahoma bridges on inventory load rating (9 t), while its 1920 build year is earlier than 99% of Comanche's recorded-year cohort (593 bridges).

ALLEY BETWN 8&9 ST in Comanche, Oklahoma is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1920, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 3. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OK:241230000000000

PRE-1950 · STEEL · MULTI-SPAN · TIED-CTRL · TRACE-ADT · LIGHT-LOAD · CAT-POOR

  • PRE-1950 Pre-1950
  • STEEL Steel
  • MULTI-SPAN 3 spans
  • TIED-CTRL Tied control
  • TRACE-ADT Trace ADT
  • LIGHT-LOAD Light load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: ALLEY BETWN 8&9 ST

The ALLEY BETWN 8&9 ST bridge in Comanche, Oklahoma carries ALLEY BETWN 8&9 ST over NUMU CREEK. It was built in 1920, making it 106 years old today. It was last reconstructed in 1931, extending its service life. The structure is built primarily of steel and spans 3 sections, stretching 12.2 meters (40 feet) end to end. Daily traffic averages 5 vehicles, placing it in the lower-traffic tier of Oklahoma bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 3/9, superstructure at 3/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed.

How ALLEY BETWN 8&9 ST compares

▼ 23.2
Load rating vs Oklahoma average (32.0 t; 22,909 of 22,917 rated)
593
Bridges in Comanche · 52 in Poor condition

Age against the county: built in 1920, earlier than 587 of Comanche's 593 bridges with a recorded construction year (99%), against a county median build year of 1976. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

ALLEY BETWN 8&9 ST 8.8 t
Oklahoma average (22,909 of 22,917 rated) 32.0 t

Live comparison across Oklahoma bridges with a recorded inventory load rating (22,909 of 22,917 rated).

ALLEY BETWN 8&9 ST vs every rated Oklahoma bridge

Inventory load rating (metric tons), FHWA NBI, this state

9 Top 97% higher than 3% of 22,909 bridges

rated Oklahoma bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
3/9
Poor (1–4)
Superstructure
3/9
Poor (1–4)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
8.8 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Comanche inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 593 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1920
Last Reconstructed
1931
Material
Steel
Number of Spans
3
Structure Length
12.2 m (40 ft)
Deck Width
4.7 m (15 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
5 vehicles/day
Structure Number
241230000000000

Condition Analysis

  • At 3/9, the deck (driving surface) is in poor shape, with advanced wear on file for this vintage.
  • At 3/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear on file for this vintage.
  • The substructure (piers and abutments) rates poor at 4/9, with advanced deterioration recorded on the latest inspection.

How to read this record

ALLEY BETWN 8&9 ST is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare ALLEY BETWN 8&9 ST against other structures in Comanche and across Oklahoma. Oklahoma bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ALLEY BETWN 8&9 ST?

ALLEY BETWN 8&9 ST in Comanche, Oklahoma has a deck rating of 3/9, superstructure rating of 3/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is ALLEY BETWN 8&9 ST inspected?

ALLEY BETWN 8&9 ST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ALLEY BETWN 8&9 ST is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ALLEY BETWN 8&9 ST?

ALLEY BETWN 8&9 ST has an NBI inventory load rating of 8.8 metric tons.

Who is responsible for maintaining ALLEY BETWN 8&9 ST?

ALLEY BETWN 8&9 ST is owned and maintained by City/Municipal Highway Agency.

How old is ALLEY BETWN 8&9 ST and does age affect safety?

ALLEY BETWN 8&9 ST was built in 1920, making it 106 years old and last reconstructed in 1931.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.