FHWA NBI 2024 Inspection record Public-domain dataset

27 S 10 W 04.00:

Carrying 27 S 10 W 04.00: over PARK CREEK

11.7 miles NE of Coos Bay, Coos, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
27 t Inventory load rating Lower than 57% of rated Oregon bridges

27 S 10 W 04.00: in Coos, Oregon sits above 43% of rated Oregon bridges on inventory load rating (27 t), while its 1965 build year is earlier than 74% of Coos's recorded-year cohort (254 bridges).

27 S 10 W 04.00: in Coos, Oregon is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 1965, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:0000000L1439077

INTERSTATE-ERA · CONCRETE · MULTI-SPAN · TIED-CTRL · LOCAL-ADT · STANDARD-LOAD · CAT-GOOD

  • INTERSTATE-ERA 1950–1979
  • CONCRETE Concrete
  • MULTI-SPAN 3 spans
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: 27 S 10 W 04.00:

The 27 S 10 W 04.00: bridge in Coos, Oregon carries 27 S 10 W 04.00: over PARK CREEK. It was built in 1965, making it 61 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 21.6 meters (71 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by Bureau of Land Management.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How 27 S 10 W 04.00: compares

▼ 4.6
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
254
Bridges in Coos · 8 in Poor condition

Age against the county: built in 1965, earlier than 187 of Coos's 254 bridges with a recorded construction year (74%), against a county median build year of 1977. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

27 S 10 W 04.00: 27.2 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

27 S 10 W 04.00: vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

27 Top 57% higher than 43% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
27.2 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Coos inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 254 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1965
Material
Concrete Continuous
Number of Spans
3
Structure Length
21.6 m (71 ft)
Deck Width
5.0 m (16 ft)
Owner
Bureau of Land Management
Avg Daily Traffic
50 vehicles/day
Structure Number
0000000L1439077

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether 27 S 10 W 04.00: is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare 27 S 10 W 04.00: against other structures in Coos and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 27 S 10 W 04.00:?

27 S 10 W 04.00: in Coos, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is 27 S 10 W 04.00: inspected?

27 S 10 W 04.00:'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 27 S 10 W 04.00: is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 27 S 10 W 04.00:?

27 S 10 W 04.00: has an NBI inventory load rating of 27.2 metric tons.

Who is responsible for maintaining 27 S 10 W 04.00:?

27 S 10 W 04.00: is owned and maintained by Bureau of Land Management.

How old is 27 S 10 W 04.00: and does age affect safety?

27 S 10 W 04.00: was built in 1965, making it 61 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.