FHWA NBI 2024 Inspection record Public-domain dataset

OR 62 (HWY 022)

Carrying OR 62 (HWY 022) over LITTLE BUTTE CREEK

03.3 N JCT HWY 270, Jackson, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
14 t Inventory load rating Lower than 94% of rated Oregon bridges

OR 62 (HWY 022) in Jackson, Oregon sits above 6% of rated Oregon bridges on inventory load rating (14 t), while its 1981 build year is earlier than 37% of Jackson's recorded-year cohort (401 bridges).

OR 62 (HWY 022) in Jackson, Oregon is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1981, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:00681B022 00933

LATE-CENTURY · PRESTRESS · MULTI-SPAN · SUPER-LED · HEAVY-ADT · LIGHT-LOAD · CAT-FAIR

  • LATE-CENTURY 1980–1999
  • PRESTRESS Prestressed concrete
  • MULTI-SPAN 3 spans
  • SUPER-LED Superstructure-led
  • HEAVY-ADT Heavy ADT
  • LIGHT-LOAD Light load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: OR 62 (HWY 022)

The OR 62 (HWY 022) bridge in Jackson, Oregon carries OR 62 (HWY 022) over LITTLE BUTTE CREEK. It was built in 1981, making it 45 years old today. It was last reconstructed in 1999, extending its service life. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 40.2 meters (132 feet) end to end. Daily traffic averages 12,664 vehicles, placing it in the heavily-trafficked tier of Oregon bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How OR 62 (HWY 022) compares

▼ 18.2
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
401
Bridges in Jackson · 6 in Poor condition

Age against the county: built in 1981, earlier than 147 of Jackson's 401 bridges with a recorded construction year (37%), against a county median build year of 1969. This is one of the newer structures in its county.

OR 62 (HWY 022) 13.6 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

OR 62 (HWY 022) vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

14 Top 94% higher than 6% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
13.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Jackson inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 401 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1981
Last Reconstructed
1999
Material
Prestressed Concrete
Number of Spans
3
Structure Length
40.2 m (132 ft)
Deck Width
29.8 m (98 ft)
Owner
State Highway Agency
Avg Daily Traffic
12,664 vehicles/day
Structure Number
00681B022 00933

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether OR 62 (HWY 022) is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare OR 62 (HWY 022) against other structures in Jackson and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for OR 62 (HWY 022)?

OR 62 (HWY 022) in Jackson, Oregon has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is OR 62 (HWY 022) inspected?

OR 62 (HWY 022)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 12,664 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. OR 62 (HWY 022) is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for OR 62 (HWY 022)?

OR 62 (HWY 022) has an NBI inventory load rating of 13.6 metric tons.

Who is responsible for maintaining OR 62 (HWY 022)?

OR 62 (HWY 022) is owned and maintained by State Highway Agency.

How old is OR 62 (HWY 022) and does age affect safety?

OR 62 (HWY 022) was built in 1981, making it 45 years old and last reconstructed in 1999.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.