FHWA NBI 2024 Inspection record Public-domain dataset

OR 213 (NE 82nd)

Carrying OR 213 (NE 82nd) over UPRR and TriMet

5.0 MI E OF PORT CENTER, Multnomah, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
23 t Inventory load rating Lower than 70% of rated Oregon bridges

OR 213 (NE 82nd) in Multnomah, Oregon sits above 30% of rated Oregon bridges on inventory load rating (23 t), while its 1934 build year is earlier than 85% of Multnomah's recorded-year cohort (473 bridges).

OR 213 (NE 82nd) in Multnomah, Oregon is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1934, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:01994 068 00224

PRE-1950 · CONCRETE · LONG-SPAN-RUN · TIED-CTRL · HEAVY-ADT · STANDARD-LOAD · CAT-FAIR

  • PRE-1950 Pre-1950
  • CONCRETE Concrete
  • LONG-SPAN-RUN 5 spans
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: OR 213 (NE 82nd)

The OR 213 (NE 82nd) bridge in Multnomah, Oregon carries OR 213 (NE 82nd) over UPRR and TriMet. It was built in 1934, making it 92 years old today. It was last reconstructed in 1954, extending its service life. The structure is built primarily of concrete continuous and spans 5 sections, stretching 35.4 meters (116 feet) end to end. Daily traffic averages 23,696 vehicles, placing it in the heavily-trafficked tier of Oregon bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How OR 213 (NE 82nd) compares

▼ 9.3
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
473
Bridges in Multnomah · 14 in Poor condition

Age against the county: built in 1934, earlier than 402 of Multnomah's 473 bridges with a recorded construction year (85%), against a county median build year of 1968. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

OR 213 (NE 82nd) 22.5 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

OR 213 (NE 82nd) vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

23 Top 70% higher than 30% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
22.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Multnomah inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 473 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1934
Last Reconstructed
1954
Material
Concrete Continuous
Number of Spans
5
Structure Length
35.4 m (116 ft)
Deck Width
35.7 m (117 ft)
Owner
State Highway Agency
Avg Daily Traffic
23,696 vehicles/day
Structure Number
01994 068 00224

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether OR 213 (NE 82nd) is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare OR 213 (NE 82nd) against other structures in Multnomah and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for OR 213 (NE 82nd)?

OR 213 (NE 82nd) in Multnomah, Oregon has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is OR 213 (NE 82nd) inspected?

OR 213 (NE 82nd)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 23,696 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. OR 213 (NE 82nd) is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for OR 213 (NE 82nd)?

OR 213 (NE 82nd) has an NBI inventory load rating of 22.5 metric tons.

Who is responsible for maintaining OR 213 (NE 82nd)?

OR 213 (NE 82nd) is owned and maintained by State Highway Agency.

How old is OR 213 (NE 82nd) and does age affect safety?

OR 213 (NE 82nd) was built in 1934, making it 92 years old and last reconstructed in 1954.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.