ROAD 28
Carrying ROAD 28 over THOMAS CREEK
NO DATA ENTERED, Lake, Oregon
Inventory: FHWA NBI 2024 · last ETL August 2026
FHWA NBI record, refreshed with each annual release.
ROAD 28 in Lake, Oregon is rated Good in the FHWA's 2024 National Bridge Inventory.
Built in 2014, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 8. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.
NBI record plate
Structure OR:060202000019022
POST-2000 · PRESTRESS · SINGLE-SPAN · SUB-LED · LOCAL-ADT · LOAD-UNK · CAT-GOOD
- POST-2000 2000+
- PRESTRESS Prestressed concrete
- SINGLE-SPAN Single span
- SUB-LED Substructure-led
- LOCAL-ADT Local ADT
- LOAD-UNK Load unrated
- CAT-GOOD Good
Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.
Bridge Snapshot: ROAD 28
The ROAD 28 bridge in Lake, Oregon carries ROAD 28 over THOMAS CREEK. It was built in 2014, making it 12 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 10.7 meters (35 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by U.S. Forest Service.
The latest FHWA inspection records show a deck rating of 9/9, superstructure at 9/9, substructure at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range.
How ROAD 28 compares
Age against the county: built in 2014, earlier than 4 of Lake's 94 bridges with a recorded construction year (4%), against a county median build year of 1981. This is one of the newer structures in its county.
Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.
Lake inventory by recorded NBI category
Exclusive Good/Fair/Poor bands across all 94 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.
Structural Details
- Year Built
- 2014
- Material
- Prestressed Concrete
- Number of Spans
- 1
- Structure Length
- 10.7 m (35 ft)
- Deck Width
- 7.6 m (25 ft)
- Owner
- U.S. Forest Service
- Avg Daily Traffic
- 50 vehicles/day
- Structure Number
- 060202000019022
Condition Analysis
- • The deck (driving surface) rates good at 9/9, with no significant deterioration on file.
- • At 9/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
- • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether ROAD 28 is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare ROAD 28 against other structures in Lake and across Oregon. Oregon bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for ROAD 28?
ROAD 28 in Lake, Oregon has a deck rating of 9/9, superstructure rating of 9/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.
How often is ROAD 28 inspected?
ROAD 28's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. ROAD 28 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for ROAD 28?
An inventory load rating is not recorded for ROAD 28.
Who is responsible for maintaining ROAD 28?
ROAD 28 is owned and maintained by U.S. Forest Service.
How old is ROAD 28 and does age affect safety?
ROAD 28 was built in 2014, making it 12 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Share this inspection record
Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.
Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.