FHWA NBI 2024 Inspection record Public-domain dataset

OR 99W (HWY 001W)

Carrying OR 99W (HWY 001W) over STEEL BR. E. APPR.

E. END OF STEEL BRIDGE, Multnomah, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
19 t Inventory load rating Lower than 82% of rated Oregon bridges

OR 99W (HWY 001W) in Multnomah, Oregon sits above 18% of rated Oregon bridges on inventory load rating (19 t), while its 1910 build year is earlier than 97% of Multnomah's recorded-year cohort (473 bridges).

OR 99W (HWY 001W) in Multnomah, Oregon is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1910, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:06683B01WX00046

PRE-1950 · STEEL · LONG-SPAN-RUN · TIED-CTRL · ARTERIAL-ADT · LIGHT-LOAD · CAT-FAIR

  • PRE-1950 Pre-1950
  • STEEL Steel
  • LONG-SPAN-RUN 7 spans
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • LIGHT-LOAD Light load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: OR 99W (HWY 001W)

The OR 99W (HWY 001W) bridge in Multnomah, Oregon carries OR 99W (HWY 001W) over STEEL BR. E. APPR.. It was built in 1910, making it 116 years old today. It was last reconstructed in 1985, extending its service life. The structure is built primarily of steel and spans 7 sections, stretching 92.7 meters (304 feet) end to end. Daily traffic averages 5,181 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How OR 99W (HWY 001W) compares

▼ 12.7
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
473
Bridges in Multnomah · 14 in Poor condition

Age against the county: built in 1910, earlier than 460 of Multnomah's 473 bridges with a recorded construction year (97%), against a county median build year of 1968. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

OR 99W (HWY 001W) 19.1 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

OR 99W (HWY 001W) vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

19 Top 82% higher than 18% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
19.1 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Multnomah inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 473 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1910
Last Reconstructed
1985
Material
Steel
Number of Spans
7
Structure Length
92.7 m (304 ft)
Deck Width
13.4 m (44 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
5,181 vehicles/day
Structure Number
06683B01WX00046

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether OR 99W (HWY 001W) is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare OR 99W (HWY 001W) against other structures in Multnomah and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for OR 99W (HWY 001W)?

OR 99W (HWY 001W) in Multnomah, Oregon has a deck rating of 6/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is OR 99W (HWY 001W) inspected?

OR 99W (HWY 001W)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,181 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. OR 99W (HWY 001W) is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for OR 99W (HWY 001W)?

OR 99W (HWY 001W) has an NBI inventory load rating of 19.1 metric tons.

Who is responsible for maintaining OR 99W (HWY 001W)?

OR 99W (HWY 001W) is owned and maintained by City/Municipal Highway Agency.

How old is OR 99W (HWY 001W) and does age affect safety?

OR 99W (HWY 001W) was built in 1910, making it 116 years old and last reconstructed in 1985.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.