FHWA NBI 2024 Inspection record Public-domain dataset

HWY 1 TO MORRISON

Carrying HWY 1 TO MORRISON over HWY 1 SB CONN 7

0.3 MI S OF BURNSIDE BR, Multnomah, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
12 t Inventory load rating Lower than 96% of rated Oregon bridges

HWY 1 TO MORRISON in Multnomah, Oregon sits above 4% of rated Oregon bridges on inventory load rating (12 t), while its 1963 build year is earlier than 60% of Multnomah's recorded-year cohort (473 bridges).

HWY 1 TO MORRISON in Multnomah, Oregon is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1963, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:08589C001 30150

INTERSTATE-ERA · STEEL · LONG-SPAN-RUN · TIED-CTRL · HEAVY-ADT · LIGHT-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • LONG-SPAN-RUN 15 spans
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • LIGHT-LOAD Light load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: HWY 1 TO MORRISON

The HWY 1 TO MORRISON bridge in Multnomah, Oregon carries HWY 1 TO MORRISON over HWY 1 SB CONN 7. It was built in 1963, making it 63 years old today. The structure is built primarily of steel and spans 15 sections, stretching 426.1 meters (1398 feet) end to end. Daily traffic averages 39,034 vehicles, placing it in the heavily-trafficked tier of Oregon bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How HWY 1 TO MORRISON compares

▼ 19.8
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
473
Bridges in Multnomah · 14 in Poor condition

Age against the county: built in 1963, earlier than 286 of Multnomah's 473 bridges with a recorded construction year (60%), against a county median build year of 1968. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

HWY 1 TO MORRISON 12.0 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

HWY 1 TO MORRISON vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

12 Top 96% higher than 4% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
12.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Multnomah inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 473 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1963
Material
Steel
Number of Spans
15
Structure Length
426.1 m (1398 ft)
Deck Width
8.2 m (27 ft)
Owner
State Highway Agency
Avg Daily Traffic
39,034 vehicles/day
Structure Number
08589C001 30150

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether HWY 1 TO MORRISON is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare HWY 1 TO MORRISON against other structures in Multnomah and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for HWY 1 TO MORRISON?

HWY 1 TO MORRISON in Multnomah, Oregon has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is HWY 1 TO MORRISON inspected?

HWY 1 TO MORRISON's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 39,034 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. HWY 1 TO MORRISON is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for HWY 1 TO MORRISON?

HWY 1 TO MORRISON has an NBI inventory load rating of 12.0 metric tons.

Who is responsible for maintaining HWY 1 TO MORRISON?

HWY 1 TO MORRISON is owned and maintained by State Highway Agency.

How old is HWY 1 TO MORRISON and does age affect safety?

HWY 1 TO MORRISON was built in 1963, making it 63 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.