FHWA NBI 2024 Inspection record Public-domain dataset

CONN 2 (PARKWAY)CO

Carrying CONN 2 (PARKWAY)CO over HWY 144

SUNSET INTERCHANGE, Washington, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
24 t Inventory load rating Lower than 65% of rated Oregon bridges

CONN 2 (PARKWAY)CO in Washington, Oregon sits above 35% of rated Oregon bridges on inventory load rating (24 t), while its 1971 build year is earlier than 67% of Washington's recorded-year cohort (326 bridges).

CONN 2 (PARKWAY)CO in Washington, Oregon is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1971, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:09607 144 00011

INTERSTATE-ERA · CONCRETE · MULTI-SPAN · TIED-CTRL · ARTERIAL-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • CONCRETE Concrete
  • MULTI-SPAN 3 spans
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: CONN 2 (PARKWAY)CO

The CONN 2 (PARKWAY)CO bridge in Washington, Oregon carries CONN 2 (PARKWAY)CO over HWY 144. It was built in 1971, making it 55 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 79.2 meters (260 feet) end to end. Daily traffic averages 1,000 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How CONN 2 (PARKWAY)CO compares

▼ 7.5
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
326
Bridges in Washington · 8 in Poor condition

Age against the county: built in 1971, earlier than 219 of Washington's 326 bridges with a recorded construction year (67%), against a county median build year of 1982. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

CONN 2 (PARKWAY)CO 24.3 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

CONN 2 (PARKWAY)CO vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

24 Top 65% higher than 35% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
24.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Washington inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 326 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1971
Material
Concrete Continuous
Number of Spans
3
Structure Length
79.2 m (260 ft)
Deck Width
13.0 m (43 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,000 vehicles/day
Structure Number
09607 144 00011

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether CONN 2 (PARKWAY)CO is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CONN 2 (PARKWAY)CO against other structures in Washington and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CONN 2 (PARKWAY)CO?

CONN 2 (PARKWAY)CO in Washington, Oregon has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is CONN 2 (PARKWAY)CO inspected?

CONN 2 (PARKWAY)CO's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CONN 2 (PARKWAY)CO is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CONN 2 (PARKWAY)CO?

CONN 2 (PARKWAY)CO has an NBI inventory load rating of 24.3 metric tons.

Who is responsible for maintaining CONN 2 (PARKWAY)CO?

CONN 2 (PARKWAY)CO is owned and maintained by State Highway Agency.

How old is CONN 2 (PARKWAY)CO and does age affect safety?

CONN 2 (PARKWAY)CO was built in 1971, making it 55 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.