FHWA NBI 2024 Inspection record Public-domain dataset

OR 238 (HWY 272)

Carrying OR 238 (HWY 272) over JACKSON CR/HANLEY RD.

3.87 MILEPOST, Jackson, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
40 t Inventory load rating Higher than 75% of rated Oregon bridges

OR 238 (HWY 272) in Jackson, Oregon sits above 75% of rated Oregon bridges on inventory load rating (40 t), while its 2006 build year is earlier than 12% of Jackson's recorded-year cohort (401 bridges).

OR 238 (HWY 272) in Jackson, Oregon is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2006, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:19727 272 03494

POST-2000 · PRESTRESS · SINGLE-SPAN · TIED-CTRL · ARTERIAL-ADT · HEAVY-LOAD · CAT-GOOD

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • HEAVY-LOAD Heavy load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: OR 238 (HWY 272)

The OR 238 (HWY 272) bridge in Jackson, Oregon carries OR 238 (HWY 272) over JACKSON CR/HANLEY RD.. It was built in 2006, making it 20 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 14.7 meters (48 feet) end to end. Daily traffic averages 6,148 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range.

How OR 238 (HWY 272) compares

▲ 8.4
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
401
Bridges in Jackson · 6 in Poor condition

Age against the county: built in 2006, earlier than 50 of Jackson's 401 bridges with a recorded construction year (12%), against a county median build year of 1969. This is one of the newer structures in its county.

OR 238 (HWY 272) 40.2 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

OR 238 (HWY 272) vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

40 Top 25% higher than 75% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
40.2 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Jackson inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 401 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2006
Material
Prestressed Concrete
Number of Spans
1
Structure Length
14.7 m (48 ft)
Deck Width
19.5 m (64 ft)
Owner
State Highway Agency
Avg Daily Traffic
6,148 vehicles/day
Structure Number
19727 272 03494

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether OR 238 (HWY 272) is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare OR 238 (HWY 272) against other structures in Jackson and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for OR 238 (HWY 272)?

OR 238 (HWY 272) in Jackson, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is OR 238 (HWY 272) inspected?

OR 238 (HWY 272)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 6,148 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. OR 238 (HWY 272) is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for OR 238 (HWY 272)?

OR 238 (HWY 272) has an NBI inventory load rating of 40.2 metric tons.

Who is responsible for maintaining OR 238 (HWY 272)?

OR 238 (HWY 272) is owned and maintained by State Highway Agency.

How old is OR 238 (HWY 272) and does age affect safety?

OR 238 (HWY 272) was built in 2006, making it 20 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.