FHWA NBI 2024 Inspection record Public-domain dataset

UPPER ROCK CR ROAD

Carrying UPPER ROCK CR ROAD over ROCK CREEK

2.9 MI SE OF HWY 19, Gilliam, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
29 t Inventory load rating Lower than 51% of rated Oregon bridges

UPPER ROCK CR ROAD in Gilliam, Oregon sits above 49% of rated Oregon bridges on inventory load rating (29 t), while its 1962 build year is earlier than 77% of Gilliam's recorded-year cohort (35 bridges).

UPPER ROCK CR ROAD in Gilliam, Oregon is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1962, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:21C08 455 00300

INTERSTATE-ERA · CONCRETE · MULTI-SPAN · TIED-CTRL · LOCAL-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • CONCRETE Concrete
  • MULTI-SPAN 3 spans
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: UPPER ROCK CR ROAD

The UPPER ROCK CR ROAD bridge in Gilliam, Oregon carries UPPER ROCK CR ROAD over ROCK CREEK. It was built in 1962, making it 64 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 24.7 meters (81 feet) end to end. Daily traffic averages 58 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How UPPER ROCK CR ROAD compares

▼ 2.8
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
35
Bridges in Gilliam

Age against the county: built in 1962, earlier than 27 of Gilliam's 35 bridges with a recorded construction year (77%), against a county median build year of 1965. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

UPPER ROCK CR ROAD 29.0 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

UPPER ROCK CR ROAD vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

29 Top 51% higher than 49% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
29.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Gilliam inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 35 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1962
Material
Concrete Continuous
Number of Spans
3
Structure Length
24.7 m (81 ft)
Deck Width
8.9 m (29 ft)
Owner
County Highway Agency
Avg Daily Traffic
58 vehicles/day
Structure Number
21C08 455 00300

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether UPPER ROCK CR ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare UPPER ROCK CR ROAD against other structures in Gilliam and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for UPPER ROCK CR ROAD?

UPPER ROCK CR ROAD in Gilliam, Oregon has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is UPPER ROCK CR ROAD inspected?

UPPER ROCK CR ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 58 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. UPPER ROCK CR ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for UPPER ROCK CR ROAD?

UPPER ROCK CR ROAD has an NBI inventory load rating of 29.0 metric tons.

Who is responsible for maintaining UPPER ROCK CR ROAD?

UPPER ROCK CR ROAD is owned and maintained by County Highway Agency.

How old is UPPER ROCK CR ROAD and does age affect safety?

UPPER ROCK CR ROAD was built in 1962, making it 64 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.