FHWA NBI 2024 Inspection record Public-domain dataset

SE UMATILLA ST

Carrying SE UMATILLA ST over B-55 OVER JOHNSON CREEK

SE UMATILLA ST AT SE 25TH, Multnomah, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
34 t Inventory load rating Higher than 63% of rated Oregon bridges

SE UMATILLA ST in Multnomah, Oregon sits above 63% of rated Oregon bridges on inventory load rating (34 t), while its 1939 build year is earlier than 83% of Multnomah's recorded-year cohort (473 bridges).

SE UMATILLA ST in Multnomah, Oregon is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1939, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:25B55 000

PRE-1950 · PRESTRESS · SINGLE-SPAN · TIED-CTRL · ARTERIAL-ADT · STANDARD-LOAD · CAT-FAIR

  • PRE-1950 Pre-1950
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: SE UMATILLA ST

The SE UMATILLA ST bridge in Multnomah, Oregon carries SE UMATILLA ST over B-55 OVER JOHNSON CREEK. It was built in 1939, making it 87 years old today. It was last reconstructed in 1979, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 14.3 meters (47 feet) end to end. Daily traffic averages 1,389 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 6/9, substructure at 5/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How SE UMATILLA ST compares

▲ 2.5
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
473
Bridges in Multnomah · 14 in Poor condition

Age against the county: built in 1939, earlier than 392 of Multnomah's 473 bridges with a recorded construction year (83%), against a county median build year of 1968. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

SE UMATILLA ST 34.3 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

SE UMATILLA ST vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

34 Top 37% higher than 63% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
34.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Multnomah inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 473 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1939
Last Reconstructed
1979
Material
Prestressed Concrete
Number of Spans
1
Structure Length
14.3 m (47 ft)
Deck Width
11.0 m (36 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
1,389 vehicles/day
Structure Number
25B55 000

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether SE UMATILLA ST is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SE UMATILLA ST against other structures in Multnomah and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SE UMATILLA ST?

SE UMATILLA ST in Multnomah, Oregon has a deck rating of 5/9, superstructure rating of 6/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is SE UMATILLA ST inspected?

SE UMATILLA ST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,389 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SE UMATILLA ST is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SE UMATILLA ST?

SE UMATILLA ST has an NBI inventory load rating of 34.3 metric tons.

Who is responsible for maintaining SE UMATILLA ST?

SE UMATILLA ST is owned and maintained by City/Municipal Highway Agency.

How old is SE UMATILLA ST and does age affect safety?

SE UMATILLA ST was built in 1939, making it 87 years old and last reconstructed in 1979.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.