FHWA NBI 2024 Inspection record Public-domain dataset

INDUSTRIAL WAY

Carrying INDUSTRIAL WAY over SANTIAM-ALBANY CANAL

001 MI S HWY22, Linn, Oregon

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
40 t Inventory load rating Higher than 74% of rated Oregon bridges

INDUSTRIAL WAY in Linn, Oregon sits above 74% of rated Oregon bridges on inventory load rating (40 t), while its 1987 build year is earlier than 20% of Linn's recorded-year cohort (566 bridges).

INDUSTRIAL WAY in Linn, Oregon is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1987, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure OR:43B120000000000

LATE-CENTURY · PRESTRESS · SINGLE-SPAN · SUB-LED · LOCAL-ADT · STANDARD-LOAD · CAT-FAIR

  • LATE-CENTURY 1980–1999
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • SUB-LED Substructure-led
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: INDUSTRIAL WAY

The INDUSTRIAL WAY bridge in Linn, Oregon carries INDUSTRIAL WAY over SANTIAM-ALBANY CANAL. It was built in 1987, making it 39 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 15.5 meters (51 feet) end to end. Daily traffic averages 443 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How INDUSTRIAL WAY compares

▲ 8.1
Load rating vs Oregon average (31.8 t; 8,282 of 8,305 rated)
566
Bridges in Linn · 100 in Poor condition

Age against the county: built in 1987, earlier than 112 of Linn's 566 bridges with a recorded construction year (20%), against a county median build year of 1967. This is one of the newer structures in its county.

INDUSTRIAL WAY 39.9 t
Oregon average (8,282 of 8,305 rated) 31.8 t

Live comparison across Oregon bridges with a recorded inventory load rating (8,282 of 8,305 rated).

INDUSTRIAL WAY vs every rated Oregon bridge

Inventory load rating (metric tons), FHWA NBI, this state

40 Top 26% higher than 74% of 8,282 bridges

rated Oregon bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
39.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Linn inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 566 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1987
Material
Prestressed Concrete
Number of Spans
1
Structure Length
15.5 m (51 ft)
Deck Width
11.0 m (36 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
443 vehicles/day
Structure Number
43B120000000000

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether INDUSTRIAL WAY is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare INDUSTRIAL WAY against other structures in Linn and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for INDUSTRIAL WAY?

INDUSTRIAL WAY in Linn, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is INDUSTRIAL WAY inspected?

INDUSTRIAL WAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 443 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. INDUSTRIAL WAY is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for INDUSTRIAL WAY?

INDUSTRIAL WAY has an NBI inventory load rating of 39.9 metric tons.

Who is responsible for maintaining INDUSTRIAL WAY?

INDUSTRIAL WAY is owned and maintained by City/Municipal Highway Agency.

How old is INDUSTRIAL WAY and does age affect safety?

INDUSTRIAL WAY was built in 1987, making it 39 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.